4601 N LA CESTA PL 91356

Certificate Information: 4601 N LA CESTA PL 91356

Application / Permit
22047-20000-00120
Plan Check / Job No.
B22VN00957
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
REMODEL THE (E) POOL TO REDO TILE, COPING, PLASTER, ADD (N) 10'-0 x 10'-0" SPA, (N) BAJA REDUCE MAXIMUM DEPTH TO 8'-6" FEET AND RELOCATE POOL EQUIPMENT. ALL WORK WITHIN SHELL. ALL WORK PER CITY STD. PLAN #268 AND ENGINEERING DETAILS
Permit Issued
Issued on 1/20/2022
Issuing Office
Current Status
CofO Issued on 8/31/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Issued 1/20/2022 APPLICANT
Building Plans Picked Up 1/24/2022 APPLICANT
CofO in Progress 8/16/2022 DAVID SANDOVAL
CofO Issued 8/31/2022 JOHN JANSON
Permit Finaled 8/31/2022 JOHN JANSON

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 15021 VENTURA BLVD STE 520      SHERMAN OAKS, CA 91403
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 2/23/2022 Conditional Approval JESUS PINEDA
Gas Piping or Gas Test 2/25/2022 Not Ready for Inspection DAVID SANDOVAL
Pre-Gunite 2/25/2022 Corrections Issued DAVID SANDOVAL
Rough-Electrical 2/25/2022 Not Ready for Inspection DAVID SANDOVAL
Rough-Plumbing 2/25/2022 Not Ready for Inspection DAVID SANDOVAL
Deputy Shotcrete 4/22/2022 Conditional Approval DAVID SANDOVAL
Pre-Gunite 4/22/2022 Approved DAVID SANDOVAL
Pre-Inspection 6/13/2022 Approved DAVID SANDOVAL
Enclosure/Fence 7/13/2022 Approved MORRIS JACKSON
Equipment Noise Level 7/19/2022 Approved ALFREDO FLORES
Pool Equipment Noise Test 7/19/2022 Approved ALFREDO FLORES
Final 7/20/2022 Corrections Issued ROBERT GOLD
SGSOV-Seismic Gas S/O Valve 7/20/2022 SGSOV Not Ready ROBERT GOLD
Final 8/1/2022 Partial Approval DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 8/1/2022 SGSOV Approved DAVID SANDOVAL
Final 8/16/2022 OK to Issue CofO DAVID SANDOVAL