4601 N LA CESTA PL 91356
Certificate Information: 4601 N LA CESTA PL 91356
- Application / Permit
- 22047-20000-00120
- Plan Check / Job No.
- B22VN00957
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- REMODEL THE (E) POOL TO REDO TILE, COPING, PLASTER, ADD (N) 10'-0 x 10'-0" SPA, (N) BAJA REDUCE MAXIMUM DEPTH TO 8'-6" FEET AND RELOCATE POOL EQUIPMENT. ALL WORK WITHIN SHELL. ALL WORK PER CITY STD. PLAN #268 AND ENGINEERING DETAILS
- Permit Issued
- Issued on 1/20/2022
- Issuing Office
- Current Status
- CofO Issued on 8/31/2022
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Issued | 1/20/2022 | APPLICANT |
| Building Plans Picked Up | 1/24/2022 | APPLICANT |
| CofO in Progress | 8/16/2022 | DAVID SANDOVAL |
| CofO Issued | 8/31/2022 | JOHN JANSON |
| Permit Finaled | 8/31/2022 | JOHN JANSON |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Intex Design And Construction Inc; Lic. No.: 981718-C53 | 15021 VENTURA BLVD STE 520 SHERMAN OAKS, CA 91403 |
| Engineer | Lacher,, Todd Lee; Lic. No.: C67656 | 1201 N TUSTIN AVE ANAHEIM, CA 92807 |
Inspector Information
| JOHN KIDWELL, (818) 774-4314 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 2/23/2022 | Conditional Approval | JESUS PINEDA |
| Gas Piping or Gas Test | 2/25/2022 | Not Ready for Inspection | DAVID SANDOVAL |
| Pre-Gunite | 2/25/2022 | Corrections Issued | DAVID SANDOVAL |
| Rough-Electrical | 2/25/2022 | Not Ready for Inspection | DAVID SANDOVAL |
| Rough-Plumbing | 2/25/2022 | Not Ready for Inspection | DAVID SANDOVAL |
| Deputy Shotcrete | 4/22/2022 | Conditional Approval | DAVID SANDOVAL |
| Pre-Gunite | 4/22/2022 | Approved | DAVID SANDOVAL |
| Pre-Inspection | 6/13/2022 | Approved | DAVID SANDOVAL |
| Enclosure/Fence | 7/13/2022 | Approved | MORRIS JACKSON |
| Equipment Noise Level | 7/19/2022 | Approved | ALFREDO FLORES |
| Pool Equipment Noise Test | 7/19/2022 | Approved | ALFREDO FLORES |
| Final | 7/20/2022 | Corrections Issued | ROBERT GOLD |
| SGSOV-Seismic Gas S/O Valve | 7/20/2022 | SGSOV Not Ready | ROBERT GOLD |
| Final | 8/1/2022 | Partial Approval | DAVID SANDOVAL |
| SGSOV-Seismic Gas S/O Valve | 8/1/2022 | SGSOV Approved | DAVID SANDOVAL |
| Final | 8/16/2022 | OK to Issue CofO | DAVID SANDOVAL |