1101 N MONUMENT ST 90272
Certificate Information: 1101 N MONUMENT ST 90272
- Application / Permit
- 22047-10000-01792
- Plan Check / Job No.
- B22LA17407
- Group
- Building
- Type
- Swimming-Pool/Spa
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (20) Pool/Spa - Private
- Work Description
- 15'0"X 15'0" POOL & 5'0" X 5'0" SPA WITHIN POOL AREA PER STANDARD PLAN #270 .WATER FEATURE LOCATED ON RAISED BOND BEAM AT WEST EDGE OF POOL.
- Permit Issued
- Issued on 10/27/2022
- Issuing Office
- Metro
- Current Status
- CofO Issued on 7/29/2024
- Certificate of Occupancy
- CofO Issued More Information
Permit Application Status History
| Submitted | 8/30/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 8/30/2022 | STANLEY RAAP |
| Corrections Issued | 8/30/2022 | STANLEY RAAP |
| Issued | 10/27/2022 | APPLICANT |
| CofO in Progress | 7/22/2024 | ARAM AVEDISIAN |
| Permit Finaled | 7/29/2024 | DANIEL ORRANTE |
| CofO Issued | 7/29/2024 | DANIEL ORRANTE |
| Permit Finaled | 7/29/2024 | DANIEL ORRANTE |
Permit Application Clearance Information
| Construction near power lines | Cleared | 10/27/2022 | WALTER RAMIREZ |
Contact Information
| Contractor | J J P Construction Inc; Lic. No.: 960864-B | 12555 VANOWEN STREET 2ND FLOOR OFC NORTH HOLLYWOOD, CA 91605 |
| Engineer | Cristescu,, Barbu Dan; Lic. No.: C72038 | 14401 SYLVAN STREET 209 VAN NUYS, CA 91401 |
Inspector Information
| TEMISTOCLES CAAL, (213) 653-1908 | Office Hours: 7:00-8:00 AM MON-FRI |
| JESUS PINEDA, (213) 653-1908 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Excavation/Setback/Form/Re-Bar | 10/10/2023 | Corrections Issued | OGANES TARAKHCHYAN |
| Pre-Gunite | 10/10/2023 | Corrections Issued | OGANES TARAKHCHYAN |
| Rough-Electrical | 10/10/2023 | Approved | OGANES TARAKHCHYAN |
| Gas Piping or Gas Test | 11/3/2023 | Not Ready for Inspection | OGANES TARAKHCHYAN |
| Pool Piping | 11/3/2023 | Approved | OGANES TARAKHCHYAN |
| Pre-Gunite | 11/3/2023 | Not Ready for Inspection | OGANES TARAKHCHYAN |
| Rough-Plumbing | 11/3/2023 | Approved | OGANES TARAKHCHYAN |
| Excavation/Setback/Form/Re-Bar | 6/17/2024 | Approved | ARAM AVEDISIAN |
| Final | 6/17/2024 | Corrections Issued | ARAM AVEDISIAN |
| Pre-Gunite | 6/17/2024 | Approved | ARAM AVEDISIAN |
| SGSOV-Seismic Gas S/O Valve | 6/17/2024 | SGSOV Approved | ARAM AVEDISIAN |
| Equipment Noise Level | 6/18/2024 | Approved | EUSEBIO GUZMAN |
| Final | 6/21/2024 | Conditional Approval | ARAM AVEDISIAN |
| Final | 7/22/2024 | OK to Issue CofO | ARAM AVEDISIAN |