5206 N EAGLE ROCK BLVD 90041

Certificate Information: 5206 N EAGLE ROCK BLVD 90041

Application / Permit
22047-10000-01281
Plan Check / Job No.
B22LA11953
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW POOL, SPA, EQUIP PER STANDARD PLAN #268 (15X35)
Permit Issued
Issued on 7/25/2022
Issuing Office
Metro
Current Status
CofO Issued on 7/16/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/21/2022 APPLICANT
Assigned to Plan Check Engineer 6/23/2022 ZAW HAN
Corrections Issued 6/27/2022 ZAW HAN
Building Plans Picked Up 7/11/2022 APPLICANT
Applicant returned to address corrections 7/12/2022 GEORGE ALVAREZ
Plan Check Approved 7/25/2022 RAHEL BEYENE
Issued 7/25/2022 APPLICANT
CofO in Progress 6/24/2023 CRAIG VAUGHAN
Permit Finaled 7/16/2023 DEROLD HAUFF
CofO Issued 7/16/2023 DEROLD HAUFF
Permit Finaled 7/16/2023 DEROLD HAUFF

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/14/2022 ALEXANDER HELFER
ZA Case Cleared 7/19/2022 MIGUEL GAMBOA

Contact Information

Contractor Sweetwater Pools Inc; Lic. No.: 740524-C53 433 W ALLEN AVE #105      SAN DIMAS, CA 91773
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

RONNIE MEDINA, (213) 469-5852 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/21/2022 Approved CRAIG VAUGHAN
Gas Piping or Gas Test 9/21/2022 Corrections Issued CRAIG VAUGHAN
Pool Piping 9/21/2022 Approved CRAIG VAUGHAN
Pre-Gunite 9/21/2022 Approved CRAIG VAUGHAN
Rough-Electrical 9/21/2022 Not Ready for Inspection CRAIG VAUGHAN
Rough-Plumbing 9/21/2022 Partial Approval CRAIG VAUGHAN
Gas Piping or Gas Test 11/28/2022 Approved CRAIG VAUGHAN
Grounding or Bonding 11/28/2022 Approved CRAIG VAUGHAN
Enclosure/Fence 3/14/2023 Corrections Issued CRAIG VAUGHAN
Enclosure/Fence 3/16/2023 Approved BRIAN SULLIVAN
Final 6/23/2023 Conditional Approval CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 6/23/2023 SGSOV Approved CRAIG VAUGHAN