130 S OLIVE ST 90012
Certificate Information: 130 S OLIVE ST 90012
- Application / Permit
- 22030-10000-06168
- Plan Check / Job No.
- B22LA16214
- Group
- Building
- Type
- Grading
- Sub-Type
- Commercial
- Primary Use
- (70) Grading - Hillside
- Work Description
- Early start grading permt **** Site preparation & excavation & backfill for New concert hall building with multiple performing arts venues, exterior gathering spaces and backstage performance support spaces, in addition to a dance school facility. ( total 23260s.f).
- Permit Issued
- Issued on 2/14/2024
- Issuing Office
- Current Status
- Issued on 2/14/2024
Permit Application Status History
| Submitted | 8/25/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 9/1/2022 | GARO TELMI |
| Corrections Issued | 9/6/2022 | GARO TELMI |
| Quality Review Completed | 9/14/2022 | CHAD DOI |
| Applicant returned to address corrections | 2/15/2023 | GARO TELMI |
| Applicant returned to address corrections | 2/22/2023 | GARO TELMI |
| Applicant returned to address corrections | 3/6/2023 | GARO TELMI |
| Applicant returned to address corrections | 3/21/2023 | GARO TELMI |
| Applicant returned to address corrections | 4/12/2023 | GARO TELMI |
| Applicant returned to address corrections | 4/26/2023 | GARO TELMI |
| Applicant returned to address corrections | 5/1/2023 | GARO TELMI |
| Applicant returned to address corrections | 12/12/2023 | GARO TELMI |
| Applicant returned to address corrections | 1/25/2024 | GARO TELMI |
| Plan Check Approved | 2/13/2024 | GARO TELMI |
| Issued | 2/14/2024 | APPLICANT |
Permit Application Clearance Information
| Roof/Waste drainage to street | Cleared | 12/7/2022 | JEANIE LAM |
| Eng Process Fee Ord 176,300 | Cleared | 1/11/2023 | JEANIE LAM |
| Work Adjacent to Public Way | Cleared | 12/11/2023 | LARRY LEE |
| "D" conditions | Cleared | 1/2/2024 | DALIA MOKAYED |
| CPC | Cleared | 1/2/2024 | DALIA MOKAYED |
| Specific Plan | Cleared | 1/2/2024 | DALIA MOKAYED |
| Tract Map conditions | Cleared | 1/2/2024 | DALIA MOKAYED |
| Tract Map conditions | Cleared | 1/2/2024 | DALIA MOKAYED |
| ZA Case | Cleared | 1/2/2024 | DALIA MOKAYED |
| ZA Case | Cleared | 1/2/2024 | DALIA MOKAYED |
| ZA Case | Cleared | 1/2/2024 | DALIA MOKAYED |
| ZA Case | Cleared | 1/2/2024 | DALIA MOKAYED |
| Address approval | Cleared | 1/4/2024 | CELINA MORENO |
| Highway dedication | Cleared | 1/4/2024 | CELINA MORENO |
| Permit | Cleared | 1/4/2024 | CELINA MORENO |
| Sewer availability | Cleared | 1/4/2024 | CELINA MORENO |
| Green Code | Cleared | 1/6/2024 | DONALD CRICHLOW |
| Bicycle Parking | Cleared | 1/8/2024 | KATHERINE MENDOZA |
| Driveway location | Cleared | 1/8/2024 | JIMMY VIVAR |
| Transportation Demand Ord. | Cleared | 1/8/2024 | JIMMY VIVAR |
| Fire Marshal Fire Life Safety | Cleared | 1/9/2024 | VIDAL GARCIA |
| Metro Rail approval | Cleared | 1/9/2024 | JENNIFER SU |
| Miscellaneous | Cleared | 1/22/2024 | GARO TELMI |
| Encroachment in public way | Cleared | 1/31/2024 | KATHERINE MENDOZA |
| Encroachment in public way | Cleared | 1/31/2024 | KATHERINE MENDOZA |
| Miscellaneous | Cleared | 1/31/2024 | KATHERINE MENDOZA |
| Hydrant and Access approval | Cleared | 2/6/2024 | MATTHEW CRAIG |
| Haul Route | Cleared | 2/9/2024 | JEFFREY CHRISTIAN |
| Excavation more than 5-ft deep | Cleared | 2/13/2024 | CALOSHA APPROVED |
Contact Information
| Contractor | Mccarthy Building Companies Inc; Lic. No.: 411173-B | 20401 S W BIRCH STREET STE 300 NEWPORT BEACH, CA 92660 |
| Engineer | Bornand,, Christophe N; Lic. No.: C80596 | 3582 VETERAN AVE LOS ANGELES, CA 90034 |
| Engineer | Howard,, Douglas Roy; Lic. No.: L6169 | 4246 SEBREN LAKEWOOD, CA 90713 |
| Engineer | Knur,, Reinard Thomas; Lic. No.: GE2755 | 1435 MONCADO DR GLENDALE, CA 91207 |
Inspector Information
| RAMAZANALI ALMASI, (213) 482-0398 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| Initial Grading | 6/9/2026 |
| Irrigation/Landscape | 6/9/2026 |
| Sub-Drain | 6/9/2026 |
| Excavation | 6/9/2026 |
Inspection Request History
| Initial Grading | 3/7/2024 | Approved | RUSSELL BONVOULOIR |
| Sub-Drain | 7/25/2024 | Approved | ALEXANDER HELFER |
| Sub-Drain | 10/22/2024 | Partial Approval | LANNY MERRICK |
| Drainage Devices/Catch Basin | 10/28/2024 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 10/28/2024 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 10/28/2024 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 12/12/2024 | Conditional Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 12/13/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 12/27/2024 | Conditional Approval | RUSSELL BONVOULOIR |
| Initial Grading | 12/27/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Private Sewage Disposal System | 12/27/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 12/27/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Bottom/Toe | 12/30/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 12/30/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 12/30/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Private Sewage Disposal System | 12/30/2024 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 1/2/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/2/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Rough | 1/2/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/3/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/3/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Bottom/Toe | 1/6/2025 | Approved | ALEXANDER HELFER |
| Drainage Devices/Catch Basin | 1/6/2025 | Approved | ALEXANDER HELFER |
| Initial Grading | 1/6/2025 | Approved | ALEXANDER HELFER |
| Excavation | 1/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Fill/Backfill | 1/7/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 1/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 1/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/8/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 1/10/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/10/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Private Sewage Disposal System | 1/10/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 1/10/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 1/13/2025 | Not Ready for Inspection | LANNY MERRICK |
| Initial Grading | 1/13/2025 | Not Ready for Inspection | LANNY MERRICK |
| Private Sewage Disposal System | 1/13/2025 | Not Ready for Inspection | LANNY MERRICK |
| Sub-Drain | 1/13/2025 | Not Ready for Inspection | LANNY MERRICK |
| Drainage Devices/Catch Basin | 1/15/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/15/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Fill/Backfill | 1/15/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/15/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Private Sewage Disposal System | 1/15/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 1/15/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/17/2025 | Partial Inspection | JONATHAN HOM |
| Initial Grading | 1/17/2025 | Partial Inspection | JONATHAN HOM |
| Private Sewage Disposal System | 1/17/2025 | Partial Inspection | JONATHAN HOM |
| Sub-Drain | 1/17/2025 | Conditional Approval | JONATHAN HOM |
| Excavation | 1/21/2025 | Partial Approval | JONATHAN HOM |
| Initial Grading | 1/21/2025 | Not Ready for Inspection | JONATHAN HOM |
| Private Sewage Disposal System | 1/21/2025 | Not Ready for Inspection | JONATHAN HOM |
| Rough | 1/21/2025 | Partial Inspection | JONATHAN HOM |
| Sub-Drain | 1/21/2025 | Partial Approval | JONATHAN HOM |
| Excavation | 1/22/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 1/22/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 1/22/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 1/23/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 1/23/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 1/23/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 1/24/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/24/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 1/24/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/29/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/29/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 1/29/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 1/30/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Initial Grading | 1/30/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 1/30/2025 | Corrections Issued | RUSSELL BONVOULOIR |
| Excavation | 1/31/2025 | Partial Inspection | JONATHAN HOM |
| Initial Grading | 1/31/2025 | Approved | JONATHAN HOM |
| Rough | 1/31/2025 | Partial Inspection | JONATHAN HOM |
| Sub-Drain | 1/31/2025 | Partial Approval | JONATHAN HOM |
| Excavation | 2/6/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 2/6/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 2/6/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 2/6/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 2/10/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 2/10/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 2/10/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Drainage Devices/Catch Basin | 2/11/2025 | Partial Approval | JONATHAN HOM |
| Excavation | 2/11/2025 | Partial Inspection | JONATHAN HOM |
| Initial Grading | 2/11/2025 | Partial Inspection | JONATHAN HOM |
| Sub-Drain | 2/11/2025 | Partial Inspection | JONATHAN HOM |
| Excavation | 2/12/2025 | Not Ready for Inspection | JONATHAN HOM |
| Initial Grading | 2/12/2025 | Not Ready for Inspection | JONATHAN HOM |
| Rough | 2/12/2025 | Not Ready for Inspection | JONATHAN HOM |
| Sub-Drain | 2/12/2025 | Not Ready for Inspection | JONATHAN HOM |
| Excavation | 2/18/2025 | Not Ready for Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 2/18/2025 | Not Ready for Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 2/18/2025 | Not Ready for Inspection | RUSSELL BONVOULOIR |
| Excavation | 2/19/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 2/19/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Rough | 2/19/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 2/19/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 2/20/2025 | Not Ready for Inspection | JONATHAN HOM |
| Initial Grading | 2/20/2025 | Not Ready for Inspection | JONATHAN HOM |
| Sub-Drain | 2/20/2025 | Not Ready for Inspection | JONATHAN HOM |
| Excavation | 2/21/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 2/21/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 2/21/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 2/24/2025 | Not Ready for Inspection | JONATHAN HOM |
| Initial Grading | 2/24/2025 | Not Ready for Inspection | JONATHAN HOM |
| Sub-Drain | 2/24/2025 | Not Ready for Inspection | JONATHAN HOM |
| Excavation | 2/27/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 2/27/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 2/27/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 3/4/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 3/4/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 3/4/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 3/5/2025 | Not Ready for Inspection | LANNY MERRICK |
| Initial Grading | 3/5/2025 | Not Ready for Inspection | LANNY MERRICK |
| Sub-Drain | 3/5/2025 | Not Ready for Inspection | LANNY MERRICK |
| Excavation | 3/19/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 3/19/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 3/19/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 3/19/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 3/24/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Initial Grading | 3/24/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 3/24/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Deputy Other (see comments) | 4/4/2025 | Conditional Approval | RUSSELL BONVOULOIR |
| Excavation | 4/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 4/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Rough | 4/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 4/7/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Drainage Devices/Catch Basin | 6/17/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 6/17/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 6/17/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 6/17/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 6/17/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 7/7/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 7/7/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 7/7/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 7/7/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Excavation | 7/17/2025 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Initial Grading | 7/17/2025 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Sub-Drain | 7/17/2025 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Excavation | 7/18/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Initial Grading | 7/18/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Sub-Drain | 7/18/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Drainage Devices/Catch Basin | 7/24/2025 | Partial Inspection | JONATHAN HOM |
| Excavation | 7/24/2025 | Partial Inspection | JONATHAN HOM |
| Initial Grading | 7/24/2025 | Partial Inspection | JONATHAN HOM |
| Sub-Drain | 7/24/2025 | Partial Inspection | JONATHAN HOM |
| Excavation | 9/25/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Fill/Backfill | 9/25/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Initial Grading | 9/25/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Rough | 9/25/2025 | Partial Inspection | RUSSELL BONVOULOIR |
| Sub-Drain | 9/25/2025 | Partial Approval | RUSSELL BONVOULOIR |
| Excavation | 3/23/2026 | Not Ready for Inspection | ROBERT PINA |
| Initial Grading | 3/23/2026 | Not Ready for Inspection | ROBERT PINA |
| Bottom/Toe | 3/24/2026 | Partial Approval | RAMAZANALI ALMASI |
| Excavation | 3/24/2026 | Partial Approval | RAMAZANALI ALMASI |
| Rough | 3/24/2026 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Excavation | 3/25/2026 | Partial Inspection | RAMAZANALI ALMASI |
| Initial Grading | 3/25/2026 | Approved | RAMAZANALI ALMASI |