7220 W ROSEWOOD AVE 90036

Certificate Information: 7220 W ROSEWOOD AVE 90036

Application / Permit
22016-90000-13903
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Reroof with 11 sqrs BUILT UP roofing. Existing solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings). Add sill plate anchor bolts, add plywood to cripple walls (if existing), and replace foundation per L.A. City Standard Plan #1 (Earthquake hazard reduction per Chapter 92 of the Los Angeles Building Code). (Houses, residential buildings up to 3 stories and up to 4 units).
Permit Issued
Issued on 5/6/2022
Issuing Office
Current Status
Permit Finaled on 12/12/2022

Permit Application Status History

Issued 5/6/2022 INTERNET PERMIT
Permit Finaled 12/9/2022 MICHAEL LEWIS

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Construction Business Consulting; Lic. No.: 622098-B P O BOX 91536      PASADENA, CA 91109

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 5/26/2022 Approved JOSEPH MCGARRY
Floor/Roof Diaphrgm/Shear Wall 5/26/2022 Partial Approval JOSEPH MCGARRY
HVAC-Rough 5/26/2022 Partial Approval JOSEPH MCGARRY
PLUMBING-Rough 5/26/2022 Partial Approval JOSEPH MCGARRY
Rough-Elec/Plmb/HVAC 5/26/2022 Partial Approval JOSEPH MCGARRY
Wood Frame 5/26/2022 Partial Approval JOSEPH MCGARRY
ELECTRICAL-Rough 6/8/2022 Approved JOSEPH MCGARRY
HVAC-Rough 6/8/2022 Approved JOSEPH MCGARRY
Insulation 6/8/2022 Conditional Approval JOSEPH MCGARRY
PLUMBING-Rough 6/8/2022 Approved JOSEPH MCGARRY
Drywall Nailing 6/14/2022 Conditional Approval JOSEPH MCGARRY
Footing/Foundation/Slab 6/23/2022 Corrections Issued JOSEPH MCGARRY
Footing/Foundation/Slab 7/1/2022 Partial Approval ADAM ESCOTO
Shower Pan 7/1/2022 Approved ADAM ESCOTO
Footing/Foundation/Slab 7/18/2022 Approved ALIZAH MAYAGOITIA
Interior/Exterior Lathing 7/18/2022 Partial Approval ALIZAH MAYAGOITIA
ELECTRICAL-Final 12/3/2022 Not Ready for Inspection JOAQUIN GREENOUGH
Final 12/3/2022 Corrections Issued JOAQUIN GREENOUGH
HVAC-Final 12/3/2022 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Final 12/3/2022 Approved JOAQUIN GREENOUGH
Final 12/9/2022 Permit Finaled MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 12/9/2022 SGSOV Approved MICHAEL LEWIS