15810 W CHATSWORTH ST 91344
Certificate Information: 15810 W CHATSWORTH ST 91344
- Application / Permit
- 22016-90000-12871
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Reroof with 40 sqrs COMP SHINGLE roofing. Existing solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
- Permit Issued
- Issued on 4/27/2022
- Issuing Office
- Current Status
- Permit Finaled on 9/15/2022
Permit Application Status History
| Issued | 4/27/2022 | INTERNET PERMIT |
| Permit Finaled | 9/14/2022 | JAVIER RAMOS JR |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Zaven Construction Inc; Lic. No.: 1078839-B | 943 CAMBRIDGE DRIVE BURBANK, CA 91504 |
Inspector Information
| CHRISTOPHER ROJAS, (818) 374-1160 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 4/29/2022 | Corrections Issued | DEANDRE HOFFMAN |
| BUILDING-Rough-Frame | 6/23/2022 | Approved | JAVIER RAMOS JR |
| ELECTRICAL-Rough | 6/23/2022 | Approved | JAVIER RAMOS JR |
| Floor/Roof Diaphrgm/Shear Wall | 6/23/2022 | Approved | JAVIER RAMOS JR |
| PLUMBING-Rough | 6/23/2022 | Approved | JAVIER RAMOS JR |
| Insulation | 7/1/2022 | Approved | JAVIER RAMOS JR |
| Interior/Exterior Lathing | 7/1/2022 | Partial Approval | JAVIER RAMOS JR |
| Shower Pan | 7/1/2022 | Approved | JAVIER RAMOS JR |
| Drywall Nailing | 7/8/2022 | Approved | CHRISTOPHER DELLEFIELD |
| Final | 9/14/2022 | Permit Finaled | JAVIER RAMOS JR |
| SGSOV-Seismic Gas S/O Valve | 9/14/2022 | SGSOV Approved | JAVIER RAMOS JR |
| Smoke Detectors | 9/14/2022 | Approved | JAVIER RAMOS JR |