11919 W COVELLO ST 91605

Certificate Information: 11919 W COVELLO ST 91605

Application / Permit
22016-90000-00011
Plan Check / Job No.
--
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Reroof with 20 sqrs COMP SHINGLE roofing over new solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Replace 12 window(s) Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
Permit Issued
Issued on 1/2/2022
Issuing Office
Current Status
Permit Finaled on 5/31/2022

Permit Application Status History

Issued 1/2/2022 INTERNET PERMIT
Permit Finaled 5/27/2022 MATT KELLERMAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Advanced General Construction; Lic. No.: 951083-B 6545 HAZELTINE AVE # 212      VAN NUYS, CA 91401

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Interior/Exterior Lathing 1/8/2022 Corrections Issued SEAN WIRCH
ELECTRICAL-Rough 1/15/2022 No Access for Inspection KRISTEN CAUSEY
PLUMBING-Rough 1/15/2022 No Access for Inspection KRISTEN CAUSEY
Interior/Exterior Lathing 1/24/2022 No Access for Inspection CALEB MEISTER
ELECTRICAL-Rough 1/26/2022 Not Ready for Inspection CALEB MEISTER
PLUMBING-Rough 1/26/2022 Not Ready for Inspection CALEB MEISTER
BUILDING-Rough-Frame 2/8/2022 Corrections Issued CALEB MEISTER
ELECTRICAL-Rough 2/8/2022 Corrections Issued CALEB MEISTER
HVAC-Rough 2/8/2022 Corrections Issued CALEB MEISTER
PLUMBING-Rough 2/8/2022 Corrections Issued CALEB MEISTER
Floor/Roof Diaphrgm/Shear Wall 2/25/2022 Corrections Issued ARAM AVEDISIAN
ELECTRICAL-Rough 3/3/2022 Approved STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 3/3/2022 Approved STEPHANIE SWANSON
HVAC-Rough 3/3/2022 Approved STEPHANIE SWANSON
PLUMBING-Rough 3/3/2022 Approved STEPHANIE SWANSON
Shower Pan 3/3/2022 Approved STEPHANIE SWANSON
Insulation 3/9/2022 Approved ASHLEY THOMPSON
Interior/Exterior Lathing 3/9/2022 Partial Approval ASHLEY THOMPSON
Insulation 3/12/2022 Approved GREGG CUMMINGS
Drywall Nailing 3/17/2022 Not Ready for Inspection KRISTEN CAUSEY
Interior/Exterior Lathing 3/17/2022 Approved KRISTEN CAUSEY
Drywall Nailing 3/21/2022 Approved ARAM AVEDISIAN
ELECTRICAL-Final 5/24/2022 Not Ready for Inspection JACK KARGODORIAN
Final 5/24/2022 Corrections Issued JACK KARGODORIAN
HVAC-Final 5/24/2022 Not Ready for Inspection JACK KARGODORIAN
PLUMBING-Final 5/24/2022 Approved JACK KARGODORIAN
ELECTRICAL-Final 5/27/2022 Approved MATT KELLERMAN
Final 5/27/2022 Permit Finaled MATT KELLERMAN
HVAC-Final 5/27/2022 Approved MATT KELLERMAN
PLUMBING-Final 5/27/2022 Approved MATT KELLERMAN