2104 N MANDEVILLE CANYON ROAD 90049

Certificate Information: 2104 N MANDEVILLE CANYON ROAD 90049

Application / Permit
22016-30000-32120
Plan Check / Job No.
B22WL03952
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior Remodel to an (E) 1-Story SIngle Family Dwellin, scope of work ot include: Remodel Bedroom, Kitchen, Bathroom, Study rooms. Remove/Replace Windows and Doors, All work per Engineer's Calcs.
Permit Issued
Issued on 4/14/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 12/22/2023

Permit Application Status History

Submitted 11/16/2022 APPLICANT
Assigned to Plan Check Engineer 11/22/2022 DAVID CASTILLO
Corrections Issued 11/22/2022 DAVID CASTILLO
Building Plans Picked Up 12/1/2022 APPLICANT
Applicant returned to address corrections 3/21/2023 DAVID CASTILLO
Plan Check Approved 4/4/2023 EDWIN ESPIN
Issued 4/14/2023 APPLICANT
Permit Finaled 12/22/2023 KEVIN SARGSYAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/31/2023 KIRK LINKLATER

Contact Information

Contractor Owner-Builder       ,
Engineer Bartelle,, Kristofer Grimm; Lic. No.: C84617 19900 ACRE ST      LOS ANGELES, CA 91324

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/17/2023 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 7/24/2023 Partial Approval KEVIN SARGSYAN
PLUMBING-Rough 7/31/2023 Partial Approval KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 8/14/2023 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 9/21/2023 Partial Approval ARAM AVEDISIAN
ELECTRICAL-Rough 9/21/2023 Approved ARAM AVEDISIAN
HVAC-Rough 9/21/2023 Approved ARAM AVEDISIAN
PLUMBING-Rough 9/21/2023 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 9/27/2023 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 10/4/2023 Approved KEVIN SARGSYAN
Green Building Rough 10/4/2023 Approved KEVIN SARGSYAN
Insulation 10/4/2023 Approved KEVIN SARGSYAN
Drywall Nailing 10/10/2023 Approved KEVIN SARGSYAN
ELECTRICAL-Final 10/10/2023 Corrections Issued KEVIN SARGSYAN
Shower Pan 10/16/2023 Not Ready for Inspection KEVIN SARGSYAN
Shower Pan 10/23/2023 Approved KEVIN SARGSYAN
ELECTRICAL-Final 12/15/2023 Corrections Issued STEPHANIE SWANSON
Final 12/15/2023 Corrections Issued STEPHANIE SWANSON
HVAC-Final 12/15/2023 Corrections Issued STEPHANIE SWANSON
PLUMBING-Final 12/15/2023 Corrections Issued STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 12/15/2023 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 12/15/2023 Approved STEPHANIE SWANSON
ELECTRICAL-Final 12/20/2023 Corrections Issued KEVIN SARGSYAN
HVAC-Final 12/20/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Final 12/20/2023 Corrections Issued KEVIN SARGSYAN
Final 12/22/2023 Permit Finaled KEVIN SARGSYAN