8566 W HOLLYWOOD BLVD 90069
Certificate Information: 8566 W HOLLYWOOD BLVD 90069
- Application / Permit
- 22016-30000-32106
- Plan Check / Job No.
- B22WL03946
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Interior / exterior remodel to (e) 2-story SFD w./ att. garage to remove bearing wall between kitchen and dining room , changeout entry door, replace fireplace framing
- Permit Issued
- Issued on 1/6/2023
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 3/17/2025
Permit Application Status History
| Submitted | 10/23/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 10/27/2022 | REZA HAGHIGHAT |
| Corrections Issued | 10/29/2022 | REZA HAGHIGHAT |
| Quality Review Completed | 11/1/2022 | CHIHARU SUZUKI |
| Building Plans Picked Up | 11/2/2022 | APPLICANT |
| Applicant returned to address corrections | 1/4/2023 | REZA HAGHIGHAT |
| Plan Check Approved | 1/6/2023 | REZA HAGHIGHAT |
| Issued | 1/6/2023 | APPLICANT |
| Permit Finaled | 3/14/2025 | ROY SPAULDING |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 1/5/2023 | KIRK LINKLATER |
Contact Information
| Contractor | Owner-Builder | , |
| Engineer | Terrio,, Greyson Franklin; Lic. No.: C87383 | 22647 VENTURA BLVD 362 WOODLAND HILLS, CA 91364 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Structural Steel Frame | 7/17/2023 | Conditional Approval | RAUL BARAJAS |
| BUILDING-Rough-Frame | 11/17/2023 | Approved | STUART CHAPMAN |
| Drywall Nailing | 11/17/2023 | Approved | STUART CHAPMAN |
| Deputy Drilled-In Anchors | 9/19/2024 | Conditional Approval | RAUL BARAJAS |
| Final | 2/21/2025 | Corrections Issued | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 2/21/2025 | SGSOV Not Ready | ROY SPAULDING |
| Smoke Detectors | 2/21/2025 | Approved | ROY SPAULDING |
| Final | 2/25/2025 | Not Ready for Inspection | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 2/25/2025 | SGSOV Not Ready | ROY SPAULDING |
| Final | 3/14/2025 | Permit Finaled | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 3/14/2025 | SGSOV Approved | ROY SPAULDING |