10355 W SUMMER HOLLY CIR 90077

Certificate Information: 10355 W SUMMER HOLLY CIR 90077

Application / Permit
22016-30000-24242
Plan Check / Job No.
B22WL03116
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior and exterior remodel to a (e) 2-story S.F.D. proposed remodel area include kitchen, dining room, and entry. (e) 1st floor bearing wall between (e) kitchen & dining room to be removed. (E) interior stairs to be rebuilt per engineer's calcs.
Permit Issued
Issued on 1/6/2023
Issuing Office
Current Status
Permit Finaled on 7/14/2023

Permit Application Status History

Submitted 8/13/2022 APPLICANT
Assigned to Plan Check Engineer 8/24/2022 JASON JANGADA
Corrections Issued 8/30/2022 JASON JANGADA
Building Plans Picked Up 9/1/2022 APPLICANT
Plan Check Approved 12/15/2022 DAVID CASTILLO
Issued 1/6/2023 APPLICANT
Permit Finaled 7/13/2023 MICHAEL PELHAM

Permit Application Clearance Information

Specific Plan Cleared 12/2/2022 NATHAN ROMINE
Grading Pre-Inspection Cleared 12/6/2022 KIRK LINKLATER

Contact Information

Contractor Corner Construction Co Inc; Lic. No.: 301167-B 865 VIA DE LA PAZ #203      PACIFIC PALISADES, CA 90272
Engineer Gorgy,, Moheb Shohdy; Lic. No.: C53260 1545 VICTORY BLVD STE 102      GLENDALE, CA 91201

Inspector Information

CARLOS MATAMOROS, (310) 914-3878 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/15/2023 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 2/24/2023 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 2/24/2023 Corrections Issued STEPHANIE SWANSON
HVAC-Rough 2/24/2023 Approved STEPHANIE SWANSON
PLUMBING-Rough 2/24/2023 Approved STEPHANIE SWANSON
ELECTRICAL-Rough 3/1/2023 Approved GERMAN RODRIGUEZ MENDOZA
BUILDING-Rough-Frame 3/10/2023 Approved GERMAN RODRIGUEZ MENDOZA
Insulation 3/13/2023 Approved GERMAN RODRIGUEZ MENDOZA
Drywall Nailing 3/20/2023 Approved GERMAN RODRIGUEZ MENDOZA
Final 7/7/2023 Not Ready for Inspection BRENDAN LOONEY
SGSOV-Seismic Gas S/O Valve 7/7/2023 SGSOV Not Ready BRENDAN LOONEY
Smoke Detectors 7/7/2023 Not Ready for Inspection BRENDAN LOONEY
Final 7/13/2023 Permit Finaled MICHAEL PELHAM
SGSOV-Seismic Gas S/O Valve 7/13/2023 SGSOV Approved MICHAEL PELHAM
Smoke Detectors 7/13/2023 Approved MICHAEL PELHAM