3404 N MANDEVILLE CANYON ROAD 90049

Certificate Information: 3404 N MANDEVILLE CANYON ROAD 90049

Application / Permit
22016-30000-13943
Plan Check / Job No.
B22WL01862
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel (E) Single family dwelling. Per engineering design. No square footage added.
Permit Issued
Issued on 6/16/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 3/14/2024

Permit Application Status History

Submitted 5/9/2022 APPLICANT
Assigned to Plan Check Engineer 5/18/2022 ALFREDO JARA
Corrections Issued 5/19/2022 ALFREDO JARA
Plan Check Approved 7/5/2022 ALFREDO JARA
Building Plans Picked Up 7/7/2022 APPLICANT
Issued 6/16/2023 APPLICANT
Permit Finaled 3/13/2024 KEVIN SARGSYAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/6/2022 ANTHONY MAINEZ
Roof/Waste drainage to street Cleared 6/15/2022 HISASHI KOBAYAKAWA
Watercourse Cleared 6/15/2022 HISASHI KOBAYAKAWA
Grading Pre-Inspection Cleared 6/23/2022 ROBERT HUGHES

Contact Information

Contractor Green Oak Builders; Lic. No.: 929471-B 5310 NORTON STREET      TORRANCE, CA 90503
Engineer Padilla,, Joseph G; Lic. No.: C72117 1553 PICASSO LN      OXNARD, CA 93033

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/20/2023 Corrections Issued KEVIN SARGSYAN
Footing/Foundation/Slab 7/25/2023 Conditional Approval KEVIN SARGSYAN
Deputy Reinf. Concrete 8/9/2023 Conditional Approval KEVIN SARGSYAN
ELECTRICAL-Rough 8/29/2023 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 8/31/2023 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 8/31/2023 Corrections Issued KEVIN SARGSYAN
BUILDING-Rough-Frame 9/6/2023 Conditional Approval KENNETH NAGLE
HVAC-Rough 9/6/2023 Approved KENNETH NAGLE
PLUMBING-Rough 9/6/2023 Approved KENNETH NAGLE
Insulation 9/11/2023 Corrections Issued KEVIN SARGSYAN
Drywall Nailing 10/24/2023 Approved KEVIN SARGSYAN
ELECTRICAL-Final 3/13/2024 Approved KEVIN SARGSYAN
Final 3/13/2024 Permit Finaled KEVIN SARGSYAN
PLUMBING-Final 3/13/2024 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 3/13/2024 SGSOV Approved KEVIN SARGSYAN
Smoke Detectors 3/13/2024 Approved KEVIN SARGSYAN