1444 N SAN REMO DR 90272

Certificate Information: 1444 N SAN REMO DR 90272

Application / Permit
22016-30000-02818
Plan Check / Job No.
B22WL00365
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EXTERIOR AND INTERIOR REMODEL OF (E) SFD WITH ATTACHED GARAGE. SCOPE OF WORK TO INCLUDE KITCHEN REMODEL, NEW SLIDING DOORS AT FAMILY ROOM, NEW WINDOW AT KITCHEN SINK, REMODEL MASTER BATHROOM AND WALK IN CLOSET, AND NEW DOORS AT BALCONY. ***SEE COMMENTS.***
Permit Issued
Issued on 11/3/2022
Issuing Office
Current Status
Permit Finaled on 7/22/2024

Permit Application Status History

Submitted 1/31/2022 APPLICANT
Assigned to Plan Check Engineer 2/1/2022 JASON JANGADA
Corrections Issued 2/1/2022 JASON JANGADA
Plan Check Approved 4/27/2022 RICHARD GARCIA
Issued 11/3/2022 APPLICANT
Building Plans Picked Up 11/9/2022 APPLICANT
Permit Finaled 7/22/2024 EVAN COOPER

Permit Application Clearance Information

Grading Pre-Inspection Cleared 4/27/2022 JASON JANGADA

Contact Information

Contractor Babineau Construction Inc; Lic. No.: 1030794-B 24955 PACIFIC COAST HWY #A203      MALIBU, CA 90265
Engineer Vlachos,, Manuel Vassilios; Lic. No.: C64976 6832 RIDGEMARK DR      MOORPARK, CA 93021

Inspector Information

KEVIN SARGSYAN, (310) 914-3889 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 1/27/2023 Partial Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 1/27/2023 Partial Approval JESUS RODRIGUEZ
Deputy Reinf. Concrete 1/30/2023 Conditional Approval STEPHANIE SWANSON
PLUMBING-Rough 2/1/2023 Partial Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 2/3/2023 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 2/3/2023 Conditional Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 2/28/2023 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 2/28/2023 Partial Approval KEVIN SARGSYAN
Wood Frame 2/28/2023 Not Ready for Inspection KEVIN SARGSYAN
Shower Pan 6/23/2023 Approved EVAN COOPER
Interior/Exterior Lathing 6/28/2023 Partial Approval OGANES TARAKHCHYAN
ELECTRICAL-Rough 7/13/2023 Approved KEVIN SARGSYAN
HVAC-Rough 7/13/2023 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 7/13/2023 Corrections Issued KEVIN SARGSYAN
Wood Frame 7/13/2023 Not Ready for Inspection KEVIN SARGSYAN
HVAC-Rough 1/18/2024 Approved KEVIN SARGSYAN
Wood Frame 5/31/2024 Partial Approval ARAM AVEDISIAN
Final 7/22/2024 Permit Finaled EVAN COOPER
Green Building Final 7/22/2024 Approved EVAN COOPER
SGSOV-Seismic Gas S/O Valve 7/22/2024 SGSOV Approved EVAN COOPER
Smoke Detectors 7/22/2024 Approved EVAN COOPER