5105 S RANDALL ST 90230

Certificate Information: 5105 S RANDALL ST 90230

Application / Permit
22016-30000-00086
Plan Check / Job No.
B22WL00003
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel (E) Single family dwelling. Per engineering design. Scope of work to include: Remodel (E) kitchen, bathroom, enlarge master bathroom and convert (E) bedroom to dining room & exterior remodel
Permit Issued
Issued on 2/9/2022
Issuing Office
Current Status
Permit Finaled on 6/29/2022

Permit Application Status History

Submitted 1/3/2022 APPLICANT
Assigned to Plan Check Engineer 1/4/2022 EDWIN ESPIN
Corrections Issued 1/4/2022 EDWIN ESPIN
Building Plans Picked Up 1/5/2022 APPLICANT
Applicant returned to address corrections 1/24/2022 EDWIN ESPIN
Plan Check Approved 1/25/2022 EDWIN ESPIN
Issued 2/9/2022 APPLICANT
Permit Finaled 6/29/2022 STEPHANIE SWANSON

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Kao,, Pen Jiun; Lic. No.: C22022 2321 FALLEN DR      ROWLAND HEIGHTS, CA 91748
Contractor Owner-Builder       ,
Engineer Jung,, Jason; Lic. No.: C80569 106 S SIERRA MADRE BLVD UNIT #2      PASADENA, CA 91107
Engineer Zhong,, Raymond Meng; Lic. No.: M27635 2416 W VALLEY BLVD      ALHAMBRA, CA 91803

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 3/14/2022 Corrections Issued JESUS RODRIGUEZ
ELECTRICAL-Rough 3/14/2022 Not Ready for Inspection JESUS RODRIGUEZ
MERV13>=Rough 3/14/2022 Not Ready for Inspection JESUS RODRIGUEZ
PLUMBING-Rough 3/14/2022 Approved JESUS RODRIGUEZ
ELECTRICAL-Rough 3/21/2022 Corrections Issued JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 3/21/2022 Conditional Approval JESUS RODRIGUEZ
HVAC-Rough 3/21/2022 Corrections Issued JESUS RODRIGUEZ
BUILDING-Rough-Frame 4/4/2022 Approved RYAN SALAZAR
ELECTRICAL-Rough 4/4/2022 Approved RYAN SALAZAR
HVAC-Rough 4/4/2022 Approved RYAN SALAZAR
MERV13>=Rough 4/4/2022 Approved RYAN SALAZAR
Insulation 4/5/2022 Approved RICHARD STEINBACH
Interior/Exterior Lathing 4/5/2022 Partial Approval RICHARD STEINBACH
Drywall Nailing 4/12/2022 Approved JESUS RODRIGUEZ
Shower Pan 4/12/2022 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 4/15/2022 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 5/18/2022 Corrections Issued STEPHANIE SWANSON
Final 5/18/2022 Corrections Issued STEPHANIE SWANSON
HVAC-Final 5/18/2022 Corrections Issued STEPHANIE SWANSON
MERV13>=Final 5/18/2022 Corrections Issued STEPHANIE SWANSON
PLUMBING-Final 5/18/2022 Corrections Issued STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 5/18/2022 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 5/18/2022 Approved STEPHANIE SWANSON
ELECTRICAL-Final 6/29/2022 Approved STEPHANIE SWANSON
Final 6/29/2022 Permit Finaled STEPHANIE SWANSON
HVAC-Final 6/29/2022 Approved STEPHANIE SWANSON
MERV13>=Final 6/29/2022 Approved STEPHANIE SWANSON
PLUMBING-Final 6/29/2022 Approved STEPHANIE SWANSON