10840 W WRIGHTWOOD LANE 91604

Certificate Information: 10840 W WRIGHTWOOD LANE 91604

Application / Permit
22016-20000-30952
Plan Check / Job No.
B22VN15207
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) 2-STORY S.F.D., REMOVE/ADD LOAD-BEARING WALLS, ADD LAUNDRY ROOM, ADD/REMOVE DOORS AND WINDOWS, ADD CLOSETS, REMODEL BATHROOMS, INCREASE SIZE OF BATHROOM IN 2ND FLOOR. ALL WORK PER ENGINEERING
Permit Issued
Issued on 11/29/2022
Issuing Office
Valley
Current Status
Permit Finaled on 5/11/2023

Permit Application Status History

Submitted 10/12/2022 APPLICANT
Assigned to Plan Check Engineer 10/17/2022 MIROOSH KHACHATOORIAN
Corrections Issued 10/17/2022 MIROOSH KHACHATOORIAN
Building Plans Picked Up 10/18/2022 APPLICANT
Plan Check Approved 11/21/2022 ALFRED RAMIREZ
Issued 11/29/2022 APPLICANT
Permit Finaled 5/10/2023 BRIAN SULLIVAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/28/2022 KIRK LINKLATER
Specific Plan Cleared 11/15/2022 OLGA AYALA
Specific Plan Cleared 11/15/2022 OLGA AYALA

Contact Information

Contractor Greencast Construction Inc; Lic. No.: 1057881-B 2430 GUTHRIE DRIVE      LOS ANGELES, CA 90034
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 12/5/2022 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 1/30/2023 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Rough 1/30/2023 Corrections Issued BRIAN SULLIVAN
HVAC-Rough 1/30/2023 Corrections Issued BRIAN SULLIVAN
PLUMBING-Rough 1/30/2023 Corrections Issued BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 1/30/2023 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 2/1/2023 Partial Approval BRIAN SULLIVAN
Insulation 2/7/2023 Not Ready for Inspection BRIAN SULLIVAN
Interior/Exterior Lathing 2/7/2023 Partial Approval BRIAN SULLIVAN
Rough-Elec/Plmb/HVAC 2/7/2023 Not Ready for Inspection BRIAN SULLIVAN
Shower Pan 2/7/2023 Not Ready for Inspection BRIAN SULLIVAN
Insulation 2/13/2023 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 2/13/2023 Approved BRIAN SULLIVAN
Shower Pan 2/13/2023 Approved BRIAN SULLIVAN
Drywall Nailing 2/22/2023 Approved BRIAN SULLIVAN
Final 5/4/2023 Corrections Issued BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 5/4/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 5/4/2023 Corrections Issued BRIAN SULLIVAN
Final 5/10/2023 Permit Finaled BRIAN SULLIVAN
Smoke Detectors 5/10/2023 Approved BRIAN SULLIVAN