5509 S VIA DONTE 90292

Certificate Information: 5509 S VIA DONTE 90292

Application / Permit
22016-20000-23511
Plan Check / Job No.
B22VN12056
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ROOFTOP LEAK REPAIR AND ROOFTOP DECK REPAIR, REPAIR TO INTERIOR WALLS DUE TO WATER DAMAGE, REPLACE ENTRY DOOR , REMODEL TO (E) SFD, DOORS AND WINDOWS TO REMAIN AND INSTALL ELEVATOR TO (E) SFD, REMODEL KITCHEN , LIVING ROOM , DINING ROOM, (5) BEDROOMS, (4) BATHROOMS, LAUNDRY , ELEVATOR, ALL WORK PER ENGINEERING
Permit Issued
Issued on 1/3/2023
Issuing Office
Valley
Current Status
Permit Finaled on 9/25/2024

Permit Application Status History

Submitted 8/5/2022 APPLICANT
Assigned to Plan Check Engineer 8/18/2022 RARES BODEA
Corrections Issued 8/22/2022 RARES BODEA
Quality Review Completed 8/24/2022 STEVEN KIM
Building Plans Picked Up 8/29/2022 APPLICANT
Applicant returned to address corrections 12/9/2022 RARES BODEA
Plan Check Approved 1/3/2023 RARES BODEA
Issued 1/3/2023 APPLICANT
Permit Finaled 9/24/2024 HERBERT GIRON

Permit Application Clearance Information

"Q" conditions Cleared 9/30/2022 STEVEN WECHSLER
Abandoned oil well Cleared 11/18/2022 MATTHEW CRAIG

Contact Information

Contractor Stanfield Barney Construction; Lic. No.: 401178-B 5223 BASCULE AVE      WOODLAND HILLS, CA 91364
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 2999 OVERLAND AVE STE 103      LOS ANGELES, CA 90064

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/19/2023 Corrections Issued HERBERT GIRON
BUILDING-Rough-Frame 5/1/2023 Not Ready for Inspection EVAN COOPER
PLUMBING-Rough 5/1/2023 Partial Approval EVAN COOPER
ELECTRICAL-Rough 1/8/2024 Approved HERBERT GIRON
PLUMBING-Rough 1/8/2024 Approved HERBERT GIRON
Special/Order Compliance 1/8/2024 Partial Inspection BEN MOLSTAD
Wood Frame 1/8/2024 Not Ready for Inspection HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 1/19/2024 Corrections Issued HERBERT GIRON
HVAC-Rough 1/19/2024 Approved HERBERT GIRON
Deputy Wood Construction 1/26/2024 Approved HERBERT GIRON
BUILDING-Rough-Frame 1/30/2024 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 1/30/2024 Approved HERBERT GIRON
Footing/Foundation/Slab 1/30/2024 Approved HERBERT GIRON
Drywall Nailing 2/7/2024 Approved HERBERT GIRON
Interior/Exterior Lathing 4/18/2024 Partial Approval HERBERT GIRON
Shower Pan 4/18/2024 Corrections Issued HERBERT GIRON
Interior/Exterior Lathing 4/19/2024 Approved HERBERT GIRON
Shower Pan 4/19/2024 Approved HERBERT GIRON
ELECTRICAL-Final 8/16/2024 Not Ready for Inspection TEMISTOCLES CAAL
Final 8/16/2024 Not Ready for Inspection TEMISTOCLES CAAL
HVAC-Final 8/16/2024 Corrections Issued TEMISTOCLES CAAL
PLUMBING-Final 8/16/2024 Approved TEMISTOCLES CAAL
SGSOV-Seismic Gas S/O Valve 8/16/2024 SGSOV Approved TEMISTOCLES CAAL
Smoke Detectors 8/16/2024 Not Ready for Inspection TEMISTOCLES CAAL
ELECTRICAL-Final 9/9/2024 Corrections Issued HERBERT GIRON
HVAC-Final 9/9/2024 Approved HERBERT GIRON
Smoke Detectors 9/9/2024 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 9/24/2024 Approved HERBERT GIRON
Final 9/24/2024 Permit Finaled HERBERT GIRON
Smoke Detectors 9/24/2024 Approved HERBERT GIRON