914 E ADAMS BLVD 90011
Certificate Information: 914 E ADAMS BLVD 90011
- Application / Permit
- 22016-20000-18126
- Plan Check / Job No.
- X22VN03372
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing ___14___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). (2)Window and (3) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 152(b) of Title 24. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 6/15/2022
- Issuing Office
- Current Status
- Permit Finaled on 10/21/2022
Permit Application Status History
| Issued | 6/15/2022 | APPLICANT |
| Permit Finaled | 10/20/2022 | RYAN SALAZAR |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Sqs Contractors Inc; Lic. No.: 1068870-B | PO BOX 482 LYNWOOD, CA 90262 |
Inspector Information
| ALEJANDRO DE ARTOLA, (213) 202-3128 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 9/9/2022 | Approved | RYAN SALAZAR |
| Pre-Inspection | 9/9/2022 | Approved | RYAN SALAZAR |
| Final | 9/27/2022 | Partial Inspection | SHAVONNE ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 9/27/2022 | SGSOV Not Ready | SHAVONNE ESPINOZA |
| Smoke Detectors | 9/27/2022 | Corrections Issued | SHAVONNE ESPINOZA |
| Final | 10/13/2022 | Corrections Issued | SHAVONNE ESPINOZA |
| SGSOV-Seismic Gas S/O Valve | 10/13/2022 | SGSOV Approved | SHAVONNE ESPINOZA |
| Smoke Detectors | 10/13/2022 | Corrections Issued | SHAVONNE ESPINOZA |
| Final | 10/20/2022 | Permit Finaled | RYAN SALAZAR |
| Smoke Detectors | 10/20/2022 | Approved | RYAN SALAZAR |