3649 S WELLINGTON ROAD 90016

Certificate Information: 3649 S WELLINGTON ROAD 90016

Application / Permit
22016-20000-14070
Plan Check / Job No.
X22VN02638
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
"COMPLY WITH DEPARTMENT ORDER effective date 04/20/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE". Kitchen (1) /bathroom (2) remodel for residential buildings (no structural changes) combined with MEP's. Window (21) and door (2) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Replace drywall (no new walls added) for single family dwellings and duplexes only.
Permit Issued
Issued on 5/12/2022
Issuing Office
Current Status
Permit Finaled on 11/22/2024

Permit Application Status History

Issued 5/12/2022 APPLICANT
Permit Finaled 11/22/2024 WILLIAM MICHALAK

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Sao Nissay; Lic. No.: 1035354-B 959 ARBOR STREET      COSTA MESA, CA 92627

Inspector Information

LUIS CORRAL, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
DONALD WONG, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
KIM DOEPPING, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI
WILLIAM MICHALAK, (213) 252-3964 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 5/17/2022 Corrections Issued GLEN RAND
ELECTRICAL-Rough 7/1/2022 Corrections Issued GLEN RAND
Interior/Exterior Lathing 7/1/2022 Corrections Issued GLEN RAND
PLUMBING-Rough 7/1/2022 Corrections Issued GLEN RAND
Pre-Inspection 7/8/2022 Corrections Issued GLEN RAND
ELECTRICAL-Rough 7/13/2022 Approved GLEN RAND
HVAC-Rough 7/13/2022 Approved GLEN RAND
PLUMBING-Rough 7/13/2022 Partial Approval GLEN RAND
Interior/Exterior Lathing 8/3/2022 Approved GLEN RAND
PLUMBING-Rough 8/3/2022 Approved GLEN RAND
Wood Frame 8/3/2022 Approved GLEN RAND
Drywall Nailing 8/5/2022 Approved GLEN RAND
Floor/Roof Diaphrgm/Shear Wall 8/5/2022 Approved GLEN RAND
Interior/Exterior Lathing 8/5/2022 Approved GLEN RAND
Shower Pan 8/5/2022 Approved GLEN RAND
SGSOV-Seismic Gas S/O Valve 10/13/2023 SGSOV Not Ready WILLIAM MICHALAK
Final 10/18/2023 Corrections Issued WILLIAM MICHALAK
SGSOV-Seismic Gas S/O Valve 5/3/2024 SGSOV Approved WILLIAM MICHALAK
Final 11/22/2024 Permit Finaled WILLIAM MICHALAK
Smoke Detectors 11/22/2024 Approved WILLIAM MICHALAK