7517 W 83RD ST 90293

Certificate Information: 7517 W 83RD ST 90293

Application / Permit
22016-20000-12106
Plan Check / Job No.
B22VN06035
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) KITCHEN, MASTER BATHROOM AND BATHROOM. REMOVE LOAD-BEARING WALL. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 5/5/2022
Issuing Office
Current Status
Permit Finaled on 11/9/2022

Permit Application Status History

Submitted 4/20/2022 APPLICANT
Assigned to Plan Check Engineer 4/21/2022 ALFRED RAMIREZ
Corrections Issued 4/21/2022 ALFRED RAMIREZ
Issued 5/5/2022 APPLICANT
Building Plans Picked Up 5/6/2022 APPLICANT
Permit Finaled 11/9/2022 BOBBY KEY

Permit Application Clearance Information

Grading Pre-Inspection Cleared 4/25/2022 LANNY MERRICK

Contact Information

Architect Dembsky,, Amit; Lic. No.: C30383 5739 KANAN ROAD # 133      AGOURA HILLS, CA 91301
Contractor Oasis Builders Inc; Lic. No.: 1055132-B 11500 WEST OLYMPIC BLVD   STE 400    LOS ANGELES, CA 90064
Engineer Messiha,, Hany Gamil; Lic. No.: C56766 19648 MULBERRY DR      WALNUT, CA 91789

Inspector Information

MICHAEL LEWIS, (310) 914-3979 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 6/15/2022 Conditional Approval BOBBY KEY
Footing/Foundation/Slab 6/17/2022 Corrections Issued PATRICK QUALEY
PLUMBING-Rough 6/17/2022 Approved PATRICK QUALEY
BUILDING-Rough-Frame 6/22/2022 Corrections Issued BOBBY KEY
ELECTRICAL-Rough 6/22/2022 Approved BOBBY KEY
Footing/Foundation/Slab 6/22/2022 Approved BOBBY KEY
Deputy Wood Construction 6/24/2022 Conditional Approval RICHARD STEINBACH
BUILDING-Rough-Frame 6/28/2022 No Access for Inspection BOBBY KEY
Insulation 6/28/2022 No Access for Inspection BOBBY KEY
Shower Pan 6/28/2022 No Access for Inspection BOBBY KEY
BUILDING-Rough-Frame 7/1/2022 Not Ready for Inspection ANDREW NAVE
Insulation 7/1/2022 Not Ready for Inspection ANDREW NAVE
Shower Pan 7/1/2022 Not Ready for Inspection ANDREW NAVE
BUILDING-Rough-Frame 7/5/2022 Approved HERBERT GIRON
Insulation 7/5/2022 Approved HERBERT GIRON
Shower Pan 7/5/2022 Approved HERBERT GIRON
Interior/Exterior Lathing 7/11/2022 Approved JESUS RODRIGUEZ
Drywall Nailing 7/13/2022 Approved DAVID FEILER
BUILDING-Rough-Frame 7/15/2022 Approved JESUS RODRIGUEZ
HVAC-Rough 7/15/2022 Approved JESUS RODRIGUEZ
Insulation 7/15/2022 Approved JESUS RODRIGUEZ
PLUMBING-Rough 7/15/2022 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 11/9/2022 Approved BOBBY KEY
Final 11/9/2022 Permit Finaled BOBBY KEY
HVAC-Final 11/9/2022 Approved BOBBY KEY
PLUMBING-Final 11/9/2022 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 11/9/2022 SGSOV Approved BOBBY KEY
Smoke Detectors 11/9/2022 Approved BOBBY KEY