459-463 S VAN NESS AVE 90020

Certificate Information: 459-463 S VAN NESS AVE 90020

Application / Permit
22016-20000-11433
Plan Check / Job No.
B22VN05634
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NONSTRUCT INT REMODEL OF EX 2 UNITS (461 & 463) @ 2ND FLR: @ 461 - REDUCE SIZE OF KITCHEN TO ADD BATHRM RM TO EX BEDRM, REMODEL KITCHEN, REMOVE EX BATHRM WITHIN A BEDRM TO ENLARGE BEDRM, CONVERT POR OF CLOSET TO WASHIER/DRYER, REMOVE NONSTRUCT WALL TO ENLARGE LIVING RM. @ 463 - REMOVE NONSTRUCT WALL BETWEEN LIVING RM & KITCHEN. REMODEL KITCHEN & BATHRM. SEE COMMENTS. <ALL WORK LIMITED TO INT REMODEL ONLY>
Permit Issued
Issued on 6/24/2022
Issuing Office
Current Status
Permit Finaled on 10/30/2023

Permit Application Status History

Submitted 4/13/2022 APPLICANT
Assigned to Plan Check Engineer 4/14/2022 HAYATO TSUCHIYA
Corrections Issued 4/14/2022 HAYATO TSUCHIYA
Plan Check Approved 5/20/2022 HAYATO TSUCHIYA
Building Plans Picked Up 5/24/2022 APPLICANT
Issued 6/24/2022 APPLICANT
Permit Finaled 10/23/2023 JEROME BLACKWOOD

Permit Application Clearance Information

CPC Cleared 4/18/2022 KATIE DEBIASE
CPC Cleared 4/18/2022 KATIE DEBIASE
CPC Cleared 4/18/2022 KATIE DEBIASE
HPOZ Cleared 4/18/2022 KATIE DEBIASE
Tenant Habitability Plan Cleared 5/18/2022 ISMAEL HERNANDEZ

Contact Information

Architect Nigosian,, Michael Nickolas; Lic. No.: C35308 75-572 PAINTED DESERT DRIVE      INDIAN WELLS, CA 92210
Contractor Tsfira Zohar; Lic. No.: 860984-B 8222 MELROSE AVENUE   # 207    LOS ANGELES, CA 90046

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 1/11/2023 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 1/13/2023 Partial Approval JEROME BLACKWOOD
Insulation 1/19/2023 Approved ALFREDO LOPEZ
Drywall Nailing 1/26/2023 Partial Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 3/9/2023 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 9/11/2023 SGSOV Not Ready ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 9/28/2023 SGSOV Not Ready ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 10/3/2023 SGSOV Not Ready ALFREDO LOPEZ
Final 10/10/2023 Not Ready for Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 10/10/2023 SGSOV Not Ready ALFREDO LOPEZ
Smoke Detectors 10/10/2023 Approved ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 10/18/2023 SGSOV Not Ready JEROME BLACKWOOD
Final 10/23/2023 Permit Finaled JEROME BLACKWOOD
Final 10/24/2023 Conditional Approval JEROME BLACKWOOD
SGSOV-Seismic Gas S/O Valve 10/24/2023 SGSOV Approved JEROME BLACKWOOD