21707 W SATICOY ST 91304

Certificate Information: 21707 W SATICOY ST 91304

Application / Permit
22016-20000-11389
Plan Check / Job No.
X22VN02079
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Re-stucco for residential buildings. Water damage, termite damage or dry-rot repair less than 10% of replacement cost of residential buildings. Kitchen remodel (unit #1 and #11) for residential buildings (no structural changes). Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over new solid sheathing (30) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B. Unit #22 water damage, termite damage or dry-rot repair less than 10% of replacement cost of residential buildings.
Permit Issued
Issued on 4/19/2022
Issuing Office
Current Status
Permit Finaled on 10/4/2022

Permit Application Status History

No Progress 4/13/2022 BLANCA MORALES
Issued 4/19/2022 APPLICANT
Permit Finaled 10/3/2022 JEFFREY FULTON

Permit Application Clearance Information

Tenant Habitability Plan Cleared 4/18/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Owner-Builder       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/20/2022 Corrections Issued JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/3/2022 Not Ready for Inspection JEFFREY FULTON
Interior/Exterior Lathing 5/3/2022 Partial Inspection JEFFREY FULTON
Special/Order Compliance 5/3/2022 Not Ready for Inspection JEFFREY FULTON
Wood Frame 5/3/2022 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/6/2022 Partial Inspection JEFFREY FULTON
Insulation 5/6/2022 Approved JEFFREY FULTON
Special/Order Compliance 5/6/2022 Partial Inspection JEFFREY FULTON
Wood Frame 5/6/2022 Partial Inspection JEFFREY FULTON
Drywall Nailing 5/12/2022 Approved JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 5/12/2022 Approved JEFFREY FULTON
Interior/Exterior Lathing 5/12/2022 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 5/12/2022 Not Ready for Inspection JEFFREY FULTON
Final 6/9/2022 Corrections Issued JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 6/9/2022 SGSOV Not Ready JEFFREY FULTON
Smoke Detectors 6/9/2022 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 6/9/2022 Not Ready for Inspection JEFFREY FULTON
Final 6/14/2022 Partial Inspection JEFFREY FULTON
SGSOV-Seismic Gas S/O Valve 6/14/2022 SGSOV Approved JEFFREY FULTON
Smoke Detectors 6/14/2022 Approved JEFFREY FULTON
Final 8/26/2022 Not Ready for Inspection JEFFREY FULTON
Reinforced Concrete Frame 8/26/2022 Approved JEFFREY FULTON
Final 10/3/2022 Permit Finaled JEFFREY FULTON