1267 S HAUSER BLVD 90019

Certificate Information: 1267 S HAUSER BLVD 90019

Application / Permit
22016-20000-10845
Plan Check / Job No.
B22VN05309
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18'-2" X 18'-4" DET. GARAGE INTO A (N) ACCESSORY DWELLING UNIT PER CA Govt. Code 65852.2(e)(1)(A) ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/18/2022
Issuing Office
Current Status
CofO Issued on 11/21/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/13/2022 APPLICANT
Assigned to Plan Check Engineer 4/14/2022 SEAN SHAHMIRI
Corrections Issued 4/20/2022 SEAN SHAHMIRI
Plan Check Approved 7/12/2022 LUISANGEL VALENZUELA
Building Plans Picked Up 7/14/2022 APPLICANT
Issued 7/18/2022 APPLICANT
CofO in Progress 11/14/2024 ARTHUR NEGRETE
Permit Finaled 11/21/2024 DEROLD HAUFF
CofO Issued 11/21/2024 DEROLD HAUFF
Permit Finaled 11/21/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/25/2022 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 4/25/2022 JEANIE LAM
Sewer availability Cleared 4/25/2022 JEANIE LAM
Construction near power lines Cleared 7/7/2022 TINA MIRANDA

Contact Information

Contractor Treeium Inc; Lic. No.: 617148-B 5352 LAUREL CANYON BLVD #200      VALLEY VILLAGE, CA 91607
Engineer Standley,, Craig Erick; Lic. No.: C87675 60 VIA CARATAMA      SAN CLEMENTE, CA 92673

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/4/2022 Corrections Issued JOSE AVILA
Footing/Foundation/Slab 11/18/2022 Partial Approval JOSE AVILA
Footing/Foundation/Slab 1/24/2023 Partial Approval ALEJANDRO DE ARTOLA
ELECTRICAL-Rough 5/18/2023 Corrections Issued JOSE AVILA
HVAC-Rough 5/18/2023 Approved JOSE AVILA
PLUMBING-Rough 5/18/2023 Corrections Issued JOSE AVILA
HVAC-Rough 5/24/2023 Approved JOSE AVILA
PLUMBING-Rough 5/24/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 6/1/2023 Not Ready for Inspection JOSE AVILA
METHANE-Rough 6/14/2023 No Access for Inspection JOSE AVILA
BUILDING-Rough-Frame 6/21/2023 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 6/21/2023 Approved JOSE AVILA
Shower Pan 6/21/2023 Approved JOSE AVILA
Insulation 6/29/2023 Corrections Issued LILIANA PORTILLO
Interior/Exterior Lathing 6/29/2023 Approved LILIANA PORTILLO
Insulation 7/20/2023 Approved JOSE AVILA
Drywall Nailing 9/11/2023 Corrections Issued LILIANA PORTILLO
Drywall Nailing 10/11/2023 Approved RONNIE MINDANAO
Pre-Inspection 12/7/2023 Corrections Issued JOAQUIN GREENOUGH
BUILDING-Rough-Frame 11/7/2024 Approved ARTHUR NEGRETE
ELECTRICAL-Final 11/7/2024 Approved ARTHUR NEGRETE
Final 11/7/2024 OK to Issue CofO ARTHUR NEGRETE
Green Building Final 11/7/2024 Approved ARTHUR NEGRETE
Green Building Rough 11/7/2024 Approved ARTHUR NEGRETE
HVAC-Final 11/7/2024 Approved ARTHUR NEGRETE
METHANE-Final 11/7/2024 Approved ARTHUR NEGRETE
METHANE-Rough 11/7/2024 Approved ARTHUR NEGRETE
PLUMBING-Final 11/7/2024 Approved ARTHUR NEGRETE
SGSOV-Seismic Gas S/O Valve 11/7/2024 SGSOV Not Required ARTHUR NEGRETE
Smoke Detectors 11/7/2024 Approved ARTHUR NEGRETE