3944 N MANDEVILLE CANYON ROAD 90049

Certificate Information: 3944 N MANDEVILLE CANYON ROAD 90049

Application / Permit
22016-20000-07036
Plan Check / Job No.
B22VN03687
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL THE KITCHEN AND REMOVE (E) INTERIOR WALLS BETWEEN THE KITCHEN AND DINING ROOM PER ENGINEER.
Permit Issued
Issued on 4/7/2022
Issuing Office
Current Status
Permit Finaled on 9/10/2022

Permit Application Status History

Submitted 3/10/2022 APPLICANT
Assigned to Plan Check Engineer 3/11/2022 ANGELICA DAVE
Corrections Issued 3/11/2022 ANGELICA DAVE
Plan Check Approved 4/1/2022 ANGELICA MARTINEZ
Issued 4/7/2022 APPLICANT
Building Plans Picked Up 4/7/2022 APPLICANT
Permit Finaled 9/9/2022 JUAN VALENZUELA

Permit Application Clearance Information

Specific Plan Cleared 3/18/2022 MIGUEL GAMBOA
Grading Pre-Inspection Cleared 4/1/2022 ANGELICA MARTINEZ

Contact Information

Contractor Ap Remodeling Inc; Lic. No.: 1049032-B 5635 INGLEWOOD BLVD #202      CULVER CITY, CA 90230
Engineer Barragan,, Pedro; Lic. No.: C90531 329 N HUBBARD AVE      SAN FERNANDO, CA 91340

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/1/2022 Approved JUAN VALENZUELA
Rough-Elec/Plmb/HVAC 7/25/2022 Corrections Issued JUAN VALENZUELA
Insulation 7/27/2022 Not Ready for Inspection PATRICK QUALEY
Interior/Exterior Lathing 7/27/2022 Not Ready for Inspection PATRICK QUALEY
Rough-Elec/Plmb/HVAC 7/27/2022 Corrections Issued PATRICK QUALEY
ELECTRICAL-Rough 7/29/2022 Corrections Issued KENNETH NAGLE
HVAC-Rough 7/29/2022 Approved KENNETH NAGLE
ELECTRICAL-Rough 8/3/2022 Partial Approval JUAN VALENZUELA
HVAC-Rough 8/3/2022 Approved JUAN VALENZUELA
Wood Frame 8/3/2022 Not Ready for Inspection JUAN VALENZUELA
BUILDING-Rough-Frame 8/5/2022 Approved JUAN VALENZUELA
Drywall Nailing 8/5/2022 Approved JUAN VALENZUELA
Final 8/23/2022 Not Ready for Inspection JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 8/23/2022 SGSOV Not Ready JUAN VALENZUELA
Smoke Detectors 8/23/2022 Not Ready for Inspection JUAN VALENZUELA
Final 9/6/2022 Corrections Issued JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 9/6/2022 SGSOV Approved JUAN VALENZUELA
Smoke Detectors 9/6/2022 Approved JUAN VALENZUELA
Final 9/9/2022 Permit Finaled JUAN VALENZUELA