1849 S STEARNS DR 90035

Certificate Information: 1849 S STEARNS DR 90035

Application / Permit
22016-20000-06444
Plan Check / Job No.
B22VN07456
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT THE (E) 19'-2" x 18'-4" DETACHED GARAGE INTO A (N) ACCESSORY DWELLING UNIT AS PER GCS 65852.2(E)(1)(A).
Permit Issued
Issued on 2/6/2023
Issuing Office
Metro
Current Status
CofO Issued on 2/29/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/15/2022 APPLICANT
Assigned to Plan Check Engineer 9/1/2022 DANIEL ABRAMYAN
Corrections Issued 9/1/2022 DANIEL ABRAMYAN
Plan Check Approved 9/30/2022 SARKIS HARABEDIAN
Issued 2/6/2023 APPLICANT
CofO in Progress 2/26/2024 STUART CHAPMAN
CofO Issued 2/29/2024 DEROLD HAUFF
Permit Finaled 2/29/2024 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 5/11/2022 JEANIE LAM
Sewer availability Cleared 5/11/2022 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 5/12/2022 JEANIE LAM
Construction near power lines Cleared 7/7/2022 TINA MIRANDA
Construction within easement Cleared 7/7/2022 TINA MIRANDA

Contact Information

Contractor Highline General Construction Inc; Lic. No.: 1028345-B 4812 BURNABY DR      COVINA, CA 91724
Engineer Kiledjian,, George Zohrab; Lic. No.: C74761 11447 VIKING AVE      NORTHRIDGE, CA 91326

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 2/15/2023 Not Ready for Inspection JOSE AVILA
Underground Mechanical 2/15/2023 Corrections Issued JOSE AVILA
Deputy Drilled-In Anchors 2/17/2023 Conditional Approval JOSE AVILA
Excavation/Setback/Form/Re-Bar 2/21/2023 Partial Approval JOSE AVILA
Footing/Foundation/Slab 2/21/2023 Corrections Issued JOSE AVILA
Sewer 2/21/2023 Approved JOSE AVILA
Footing/Foundation/Slab 2/24/2023 Approved JOSE AVILA
BUILDING-Rough-Frame 8/10/2023 Corrections Issued STUART CHAPMAN
ELECTRICAL-Rough 8/10/2023 Approved STUART CHAPMAN
Gas Test 8/10/2023 Partial Approval STUART CHAPMAN
PLUMBING-Rough 8/10/2023 Approved STUART CHAPMAN
Verify Sprinkler Sign Off 8/10/2023 Not Ready for Inspection STUART CHAPMAN
HVAC-Rough 8/17/2023 Approved LILIANA PORTILLO
Insulation 8/17/2023 Approved LILIANA PORTILLO
Drywall Nailing 8/23/2023 Approved LILIANA PORTILLO
Interior/Exterior Lathing 9/19/2023 Approved LILIANA PORTILLO
Final 11/3/2023 Corrections Issued JOSE AVILA
BUILDING-Rough-Frame 11/9/2023 Approved JOSE AVILA
Final 11/9/2023 Corrections Issued JOSE AVILA
Green Building Final 11/9/2023 Approved JOSE AVILA
Green Building Rough 11/9/2023 Approved JOSE AVILA
SGSOV-Seismic Gas S/O Valve 11/9/2023 SGSOV Approved JOSE AVILA
Smoke Detectors 11/9/2023 Approved JOSE AVILA
Final 1/3/2024 Corrections Issued RONNIE MINDANAO
Final 1/16/2024 Conditional Approval RONNIE MINDANAO
Final 2/26/2024 OK to Issue CofO STUART CHAPMAN