1938 S HARVARD BLVD 90018

Certificate Information: 1938 S HARVARD BLVD 90018

Application / Permit
22016-10001-03890
Plan Check / Job No.
B22LA23608
Group
Building
Type
Bldg-Addition
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
ePLAN Supplemental to permit # 22016-10000-03864.for building 2 FOR ADDITIONAL SCOPE OF WORK TO SINGLE PODIUM BUILDING. Revisions for this permit include; reconfiguring units in building 2 to provide an additional 3-bedroom mobility unit and 4-bedroom mobility unit to comply with dispersion requirements, including two small bathroom additions. Providing accessible parking spaces and two wheel chair lifts to connect the newly designated lower level accessible route to the newly designated accessible pedestrian and ground level circulation route.
Permit Issued
Issued on 4/20/2023
Issuing Office
Current Status
CofO Issued on 9/10/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/20/2022 APPLICANT
Assigned to Plan Check Engineer 1/12/2023 ARSALAN SHABESTARI
Corrections Issued 1/18/2023 ARSALAN SHABESTARI
Quality Review Completed 1/23/2023 GARO TELMI
Applicant returned to address corrections 3/16/2023 ARSALAN SHABESTARI
Plan Check Approved 3/24/2023 ARSALAN SHABESTARI
Issued 4/20/2023 APPLICANT
CofO in Progress 8/23/2024 LUIS CCAMACHO
CofO in Progress 9/9/2024 JEROME BLACKWOOD
CofO in Progress 9/10/2024 JEROME BLACKWOOD
CofO Issued 9/10/2024 ERNESTO CORRAL
Permit Finaled 9/10/2024 ERNESTO CORRAL

Permit Application Clearance Information

CPC Cleared 1/31/2023 LOUIS ORTEGA
Roof/Waste drainage to street Cleared 2/5/2023 ADRIAN SANCHEZ
HPOZ Cleared 2/6/2023 MICAELA TORRES-GIL
Eng Process Fee Ord 176,300 Cleared 2/7/2023 ADRIAN SANCHEZ
Sewer availability Cleared 2/7/2023 ADRIAN SANCHEZ
Green Code Cleared 2/22/2023 Kevin Morales
Hydrant and Access approval Cleared 2/22/2023 JOHN CONNEALLY
DAS Clearance Cleared 3/2/2023 Kevin Morales
Public Housing Cleared 3/17/2023 RONALD PACHECO

Contact Information

Contractor Precision General Commercial Contractors Inc; Lic. No.: 790153-B 7250 REDWOOD BLVD STE 214      NOVATO, CA 94945

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/11/2023 Partial Approval RONALD JIMENEZ
Final 12/18/2023 Not Ready for Inspection RICARDO ROBLES
Footing/Foundation/Slab 12/18/2023 Not Ready for Inspection RICARDO ROBLES
Green Building Final 12/18/2023 Not Ready for Inspection RICARDO ROBLES
Green Building Rough 12/18/2023 Not Ready for Inspection RICARDO ROBLES
METHANE-Barrier 12/18/2023 No Access for Inspection MARTIN TAVITIAN
METHANE-Final 12/18/2023 Not Ready for Inspection RICARDO ROBLES
METHANE-Rough 12/18/2023 Not Ready for Inspection RICARDO ROBLES
METHANE-Subgrade 12/18/2023 No Access for Inspection MARTIN TAVITIAN
Smoke Detectors 12/18/2023 No Access for Inspection MARTIN TAVITIAN
Wood Frame 12/18/2023 No Access for Inspection MARTIN TAVITIAN
Final 12/20/2023 Not Ready for Inspection JEROME BLACKWOOD
Footing/Foundation/Slab 12/20/2023 Approved JEROME BLACKWOOD
Green Building Final 12/20/2023 Not Ready for Inspection JEROME BLACKWOOD
Green Building Rough 12/20/2023 Not Ready for Inspection JEROME BLACKWOOD
METHANE-Barrier 12/20/2023 Approved JEROME BLACKWOOD
METHANE-Final 12/20/2023 Approved JEROME BLACKWOOD
METHANE-Rough 12/20/2023 Approved JEROME BLACKWOOD
METHANE-Subgrade 12/20/2023 Approved JEROME BLACKWOOD
Smoke Detectors 12/20/2023 Not Ready for Inspection JEROME BLACKWOOD
Wood Frame 12/20/2023 Not Ready for Inspection JEROME BLACKWOOD
Final 8/12/2024 OK to Issue CofO JEROME BLACKWOOD
Green Building Final 8/12/2024 Approved JEROME BLACKWOOD
Green Building Rough 8/12/2024 Approved JEROME BLACKWOOD
Smoke Detectors 8/12/2024 Approved JEROME BLACKWOOD
Wood Frame 8/12/2024 Approved JEROME BLACKWOOD
Final 8/20/2024 OK to Issue CofO JEROME BLACKWOOD
Wood Frame 8/20/2024 Approved JEROME BLACKWOOD
Final 8/23/2024 OK to Issue CofO LUIS CCAMACHO
Wood Frame 8/23/2024 Approved LUIS CCAMACHO