625 N MICHELTORENA ST 90026

Certificate Information: 625 N MICHELTORENA ST 90026

Application / Permit
22016-10000-38951
Plan Check / Job No.
B22LA26258
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
**ePlan ** Addition to and conversion of (E) Detached Garage at rear of the lot to an Accessory Dweeling Unit (ADU) per CA Govt. Code 65852.2(e)(1)(A) using the Wood Frame Prescriptive Provisions
Permit Issued
Issued on 7/17/2023
Issuing Office
Current Status
CofO Issued on 3/13/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/26/2022 APPLICANT
Assigned to Plan Check Engineer 12/30/2022 EDWIN ESPIN
Corrections Issued 1/3/2023 EDWIN ESPIN
Applicant returned to address corrections 2/8/2023 EDWIN ESPIN
Applicant returned to address corrections 3/23/2023 EDWIN ESPIN
Plan Check Approved 7/15/2023 EDWIN ESPIN
Issued 7/17/2023 APPLICANT
CofO in Progress 3/12/2025 FREDDIE RIVERA
Permit Finaled 3/13/2025 DEROLD HAUFF
CofO Issued 3/13/2025 DEROLD HAUFF
Permit Finaled 3/13/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 1/9/2023 CHRISTOPHER ROCHA
Roof/Waste drainage to street Cleared 1/9/2023 CHRISTOPHER ROCHA
Eng Process Fee Ord 176,300 Cleared 1/12/2023 CHRISTOPHER ROCHA
Sewer availability Cleared 1/12/2023 CHRISTOPHER ROCHA
Tenant Habitability Plan Cleared 3/2/2023 MICHAEL SOTO
Grading Pre-Inspection Cleared 3/9/2023 KIRK LINKLATER
Hydrant and Access approval Cleared 3/19/2023 KURT CORRAL

Contact Information

Contractor Owner-Builder       ,

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/17/2023 Corrections Issued FREDDIE RIVERA
METHANE-Barrier 10/17/2023 Partial Inspection FREDDIE RIVERA
METHANE-Subgrade 10/17/2023 Partial Inspection FREDDIE RIVERA
Footing/Foundation/Slab 10/19/2023 Partial Inspection FREDDIE RIVERA
METHANE-Barrier 10/19/2023 Partial Inspection FREDDIE RIVERA
METHANE-Subgrade 10/19/2023 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 10/24/2023 Approved FREDDIE RIVERA
METHANE-Barrier 10/24/2023 Approved FREDDIE RIVERA
METHANE-Subgrade 10/24/2023 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 11/14/2023 Partial Inspection FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 11/14/2023 Partial Approval FREDDIE RIVERA
Green Building Rough 11/14/2023 Corrections Issued FREDDIE RIVERA
METHANE-Rough 11/14/2023 Partial Inspection FREDDIE RIVERA
Wood Frame 11/14/2023 Partial Inspection FREDDIE RIVERA
BUILDING-Rough-Frame 11/30/2023 Corrections Issued FREDDIE RIVERA
Green Building Rough 11/30/2023 Partial Inspection FREDDIE RIVERA
METHANE-Rough 11/30/2023 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Rough 2/8/2024 Approved FREDDIE RIVERA
PLUMBING-Rough 2/8/2024 Corrections Issued FREDDIE RIVERA
HVAC-Rough 3/6/2024 Approved FREDDIE RIVERA
PLUMBING-Rough 3/6/2024 Approved FREDDIE RIVERA
Pre-Inspection 3/6/2024 Corrections Issued FREDDIE RIVERA
BUILDING-Rough-Frame 3/8/2024 Approved FREDDIE RIVERA
Green Building Rough 3/8/2024 Approved FREDDIE RIVERA
METHANE-Rough 3/8/2024 Approved FREDDIE RIVERA
Insulation 3/15/2024 Approved JOSH MEISTER
Interior/Exterior Lathing 3/15/2024 Partial Approval JOSH MEISTER
Drywall Nailing 7/9/2024 Approved FREDDIE RIVERA
Shower Pan 7/9/2024 Approved FREDDIE RIVERA
Final 12/20/2024 Corrections Issued FREDDIE RIVERA
Green Building Final 12/20/2024 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 12/20/2024 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 12/20/2024 Approved FREDDIE RIVERA
Final 1/14/2025 No Access for Inspection FREDDIE RIVERA
Green Building Final 1/14/2025 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 1/14/2025 SGSOV Not Ready FREDDIE RIVERA
Final 2/19/2025 Partial Inspection FREDDIE RIVERA
Green Building Final 2/19/2025 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 2/19/2025 SGSOV Not Ready FREDDIE RIVERA
Final 3/3/2025 OK to Issue CofO FREDDIE RIVERA
Green Building Final 3/3/2025 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 3/3/2025 SGSOV Approved FREDDIE RIVERA