1042 N OLANCHA DR 90065

Certificate Information: 1042 N OLANCHA DR 90065

Application / Permit
22016-10000-38177
Plan Check / Job No.
B22LA25497
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
STRUCTURAL REPAIRS AND UPGRADES, PARTIAL UNDERPINNING PER SOILS ENGINEERING TO (E) TWO STORY SFD W/ ATTACHED CARPORT.
Permit Issued
Issued on 4/16/2025
Issuing Office
Metro
Current Status
Permit Finaled on 5/6/2026

Permit Application Status History

Submitted 12/16/2022 APPLICANT
Assigned to Plan Check Engineer 1/5/2023 SERGIO GUTIERREZ
Corrections Issued 1/23/2023 SERGIO GUTIERREZ
Quality Review Completed 1/25/2023 KEN GILL
Building Plans Picked Up 2/1/2023 APPLICANT
Applicant returned to address corrections 11/19/2024 SERGIO GUTIERREZ
Plan Check Approved 4/16/2025 SERGIO GUTIERREZ
Issued 4/16/2025 APPLICANT
Permit Finaled 5/6/2026 NICHOLAS LOPEZ

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 4/14/2023 CINDY QI
Roof/Waste drainage to street Cleared 4/14/2023 CINDY QI
Sewer availability Cleared 4/14/2023 CINDY QI
Specific Plan Cleared 6/26/2024 DORIAN AGUILAR
Grading Pre-Inspection Cleared 12/11/2024 SERGIO GUTIERREZ

Contact Information

Contractor Alpha Structural Inc; Lic. No.: 663409-B 8334 FOOTHILL BLVD      SUNLAND, CA 91040
Engineer Alam,, Anwar; Lic. No.: S5719 372 FLORAL VIEW      IRVINE, CA 92618
Engineer Su,, Yu-Ting; Lic. No.: C76714 28 SAGE      LAKE FOREST, CA 92630
Geologist Carrle,, Conrad Henry; Lic. No.: EG2359 23128 WILDWOOD ROAD      NEWHALL, CA 91321

Inspector Information

NICHOLAS LOPEZ, (213) 202-3224 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/29/2025 Partial Inspection NICHOLAS LOPEZ
Deputy Reinf. Concrete 6/4/2025 Conditional Approval NICHOLAS LOPEZ
Piling/Pier/Caisson 6/5/2025 Approved NICHOLAS LOPEZ
Excavation/Setback/Form/Re-Bar 6/11/2025 Not Ready for Inspection NICHOLAS LOPEZ
Excavation/Setback/Form/Re-Bar 6/12/2025 Approved NICHOLAS LOPEZ
Deputy Reinf. Concrete 6/16/2025 Conditional Approval NICHOLAS LOPEZ
Wood Frame 2/6/2026 Approved DAVID WILLIAMS
Interior/Exterior Lathing 3/12/2026 Approved LILIANA PORTILLO
Final 4/2/2026 Not Ready for Inspection RONNIE MEDINA
SGSOV-Seismic Gas S/O Valve 4/2/2026 SGSOV Not Ready RONNIE MEDINA
Smoke Detectors 4/2/2026 Partial Inspection RONNIE MEDINA
Final 5/6/2026 Permit Finaled NICHOLAS LOPEZ
SGSOV-Seismic Gas S/O Valve 5/6/2026 SGSOV Approved NICHOLAS LOPEZ
Smoke Detectors 5/6/2026 Approved NICHOLAS LOPEZ