5653 N WILLOW CREST AVE 91601
Certificate Information: 5653 N WILLOW CREST AVE 91601
- Application / Permit
- 22016-10000-37890
- Plan Check / Job No.
- X22LA17981
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___8___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. (1) Kitchen / (1) Bathroom remodel for residential buildings (no structural changes). (12) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
- Permit Issued
- Issued on 1/4/2023
- Issuing Office
- Current Status
- Permit Finaled on 5/5/2023
Permit Application Status History
| Issued | 1/4/2023 | APPLICANT |
| Permit Finaled | 5/4/2023 | ROBERT GOLD |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Heaven Construction Inc; Lic. No.: 1010001-B | 800 S AZUSA AVE UNIT E1 AZUSA, CA 91702 |
Inspector Information
| GAREN HAYRAPETYAN, (818) 374-1171 | Office Hours: 7:00-8:00 AM MON-FRI |
| ROBERTO PALACIOS-LOPEZ, (818) 374-1171 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 1/24/2023 | Approved | JOHN HAYES |
| Wood Frame | 1/24/2023 | Corrections Issued | JOHN HAYES |
| Special/Order Compliance | 1/27/2023 | Partial Inspection | MISAEL ESPARZA |
| Wood Frame | 2/2/2023 | Approved | JOHN HAYES |
| Insulation | 2/4/2023 | Approved | KEVIN SARGSYAN |
| Drywall Nailing | 2/11/2023 | Approved | JEFFREY BULL |
| Final | 4/7/2023 | Corrections Issued | JOHN HAYES |
| SGSOV-Seismic Gas S/O Valve | 4/7/2023 | SGSOV Approved | JOHN HAYES |
| Smoke Detectors | 4/7/2023 | Approved | JOHN HAYES |
| Final | 4/13/2023 | Not Ready for Inspection | JOHN COLEMAN |
| Final | 5/2/2023 | No Access for Inspection | JOHN HAYES |
| Final | 5/4/2023 | Permit Finaled | ROBERT GOLD |