2136 S GLENCOE AVE 90291

Certificate Information: 2136 S GLENCOE AVE 90291

Application / Permit
22016-10000-36614
Plan Check / Job No.
B22LA24445
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN INTERIOR REMODEL TO (E) SFD WITH ATTACHED GARAGE
Permit Issued
Issued on 4/18/2023
Issuing Office
Current Status
Permit Finaled on 3/20/2025

Permit Application Status History

Submitted 12/4/2022 APPLICANT
Assigned to Plan Check Engineer 12/9/2022 FERNANDO FLORES
Plan Check Approved 12/10/2022 FERNANDO FLORES
Issued 4/18/2023 APPLICANT
Permit Finaled 3/19/2025 JESUS PINEDA

Permit Application Clearance Information

No Data Available.

Contact Information

Architect , ; Lic. No.: C37534 4474 W. 133RD STREET      HAWTHORNE, CA 90250
Contractor Allen Design + Build Inc; Lic. No.: 1073018-B       ,
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 2999 OVERLAND AVE STE 103      LOS ANGELES, CA 90064

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 7/11/2023 Conditional Approval EVAN COOPER
Footing/Foundation/Slab 7/11/2023 Corrections Issued EVAN COOPER
Floor/Roof Diaphrgm/Shear Wall 8/3/2023 Corrections Issued EVAN COOPER
ELECTRICAL-Rough 9/28/2023 Corrections Issued TEMISTOCLES CAAL
Interior/Exterior Lathing 11/30/2023 Not Ready for Inspection HERBERT GIRON
Interior/Exterior Lathing 12/4/2023 No Access for Inspection TEMISTOCLES CAAL
PLUMBING-Rough 12/4/2023 No Access for Inspection TEMISTOCLES CAAL
PLUMBING-Rough 12/13/2023 No Access for Inspection TEMISTOCLES CAAL
Interior/Exterior Lathing 12/14/2023 Approved JESUS RODRIGUEZ
PLUMBING-Rough 12/14/2023 Conditional Approval JESUS RODRIGUEZ
BUILDING-Rough-Frame 12/27/2023 No Access for Inspection TEMISTOCLES CAAL
BUILDING-Rough-Frame 1/25/2024 No Access for Inspection HERBERT GIRON
Footing/Foundation/Slab 1/25/2024 No Access for Inspection HERBERT GIRON
Deputy Drilled-In Anchors 2/8/2024 Conditional Approval HERBERT GIRON
Insulation 2/9/2024 Corrections Issued HERBERT GIRON
Deputy Drilled-In Anchors 3/19/2024 Conditional Approval HERBERT GIRON
BUILDING-Rough-Frame 3/20/2024 Not Ready for Inspection HERBERT GIRON
ELECTRICAL-Rough 3/20/2024 Not Ready for Inspection HERBERT GIRON
Excavation/Setback/Form/Re-Bar 3/20/2024 Approved HERBERT GIRON
Footing/Foundation/Slab 3/20/2024 Approved HERBERT GIRON
Deputy Drilled-In Anchors 3/26/2024 Conditional Approval HERBERT GIRON
ELECTRICAL-Rough 3/29/2024 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 3/29/2024 Approved HERBERT GIRON
PLUMBING-Rough 3/29/2024 Approved HERBERT GIRON
BUILDING-Rough-Frame 5/17/2024 Corrections Issued HERBERT GIRON
BUILDING-Rough-Frame 7/22/2024 Not Ready for Inspection HERBERT GIRON
HVAC-Rough 7/26/2024 Corrections Issued HERBERT GIRON
ELECTRICAL-Rough 8/8/2024 Approved HERBERT GIRON
HVAC-Rough 8/8/2024 Corrections Issued HERBERT GIRON
BUILDING-Rough-Frame 8/14/2024 Approved EVAN COOPER
HVAC-Rough 8/14/2024 Approved EVAN COOPER
Insulation 8/23/2024 Corrections Issued TEMISTOCLES CAAL
Insulation 8/29/2024 Corrections Issued TEMISTOCLES CAAL
Insulation 9/4/2024 Approved TEMISTOCLES CAAL
Drywall Nailing 9/17/2024 Approved HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 9/20/2024 Approved HERBERT GIRON
Shower Pan 9/20/2024 Approved HERBERT GIRON
Interior/Exterior Lathing 10/9/2024 Approved MICHAEL ALLEN
HVAC-Final 1/27/2025 Corrections Issued HERBERT GIRON
PLUMBING-Final 1/27/2025 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 3/7/2025 Corrections Issued HERBERT GIRON
Final 3/7/2025 Corrections Issued HERBERT GIRON
Green Building Final 3/7/2025 Approved HERBERT GIRON
HVAC-Final 3/7/2025 Approved HERBERT GIRON
PLUMBING-Final 3/7/2025 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 3/7/2025 SGSOV Approved HERBERT GIRON
Smoke Detectors 3/7/2025 Approved HERBERT GIRON
ELECTRICAL-Final 3/19/2025 Approved JESUS PINEDA
Final 3/19/2025 Permit Finaled JESUS PINEDA