8154 N WYNNE AVE 91335
Certificate Information: 8154 N WYNNE AVE 91335
- Application / Permit
- 22016-10000-34300
- Plan Check / Job No.
- X22LA16883
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- 15 Window and door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24 1 Kitchen/ 2 bathroom remodel for residential buildings (no structural changes). combined with electrical Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing __15____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B Remove existing roof tiles, apply new underlayment and reset roof tiles (Cool roof compliance is not required
- Permit Issued
- Issued on 11/12/2022
- Issuing Office
- Current Status
- Permit Finaled on 4/19/2023
Permit Application Status History
| Issued | 11/12/2022 | APPLICANT |
| Permit Finaled | 4/18/2023 | JEFFREY BULL |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| ARUTYUN MADATYAN, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
| JUAN ALVARADO, (818) 774-4307 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 4/11/2023 | Not Ready for Inspection | JEFFREY BULL |
| SGSOV-Seismic Gas S/O Valve | 4/11/2023 | SGSOV Not Ready | JEFFREY BULL |
| Smoke Detectors | 4/11/2023 | Approved | JEFFREY BULL |
| Final | 4/14/2023 | Corrections Issued | JUSTIN HAWLEY |
| SGSOV-Seismic Gas S/O Valve | 4/14/2023 | SGSOV Approved | JUSTIN HAWLEY |
| Final | 4/18/2023 | Permit Finaled | JEFFREY BULL |