719 1/2 N CORONADO ST 90026

Certificate Information: 719 1/2 N CORONADO ST 90026

Application / Permit
22016-10000-33774
Plan Check / Job No.
B22LA22579
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Demo and Replace the existing Staircase and adding footing with voluntary seismic retrofit at rear of existing SFD
Permit Issued
Issued on 12/29/2022
Issuing Office
Metro
Current Status
Permit Finaled on 6/5/2023

Permit Application Status History

Submitted 11/7/2022 APPLICANT
Assigned to Plan Check Engineer 11/7/2022 ZAW HAN
Corrections Issued 11/7/2022 ZAW HAN
Applicant returned to address corrections 12/20/2022 ZAW HAN
Plan Check Approved 12/29/2022 MINA HABILI
Issued 12/29/2022 APPLICANT
Permit Finaled 6/2/2023 FREDDIE RIVERA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 12/5/2022 KIRK LINKLATER
Tenant Habitability Plan Cleared 12/27/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Turn Key Construction And Design Inc; Lic. No.: 1061590-B 527 N VERDUGO ROAD      GLENDALE, CA 91206
Engineer Barakat,, Fouad Chafic; Lic. No.: C67449 11 CEDARWOOD DR      POMONA, CA 91766

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 2/7/2023 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 2/7/2023 Partial Inspection FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 2/17/2023 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 2/17/2023 Partial Inspection FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 3/6/2023 Approved FREDDIE RIVERA
Footing/Foundation/Slab 3/6/2023 Approved FREDDIE RIVERA
Wood Frame 3/20/2023 Corrections Issued ALIZAH MAYAGOITIA
Wood Frame 3/30/2023 Corrections Issued STUART CHAPMAN
Interior/Exterior Lathing 5/16/2023 Corrections Issued FREDDIE RIVERA
BUILDING-Rough-Frame 6/2/2023 Approved FREDDIE RIVERA
Final 6/2/2023 Permit Finaled FREDDIE RIVERA
Insulation 6/2/2023 Approved FREDDIE RIVERA
MERV13>=Final 6/2/2023 Approved FREDDIE RIVERA
MERV13>=Rough 6/2/2023 Approved FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 6/2/2023 SGSOV Approved FREDDIE RIVERA
Smoke Detectors 6/2/2023 Approved FREDDIE RIVERA