4820 S VERMONT AVE 90037

Certificate Information: 4820 S VERMONT AVE 90037

Application / Permit
22016-10000-33359
Plan Check / Job No.
B22LA22212
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(12) Manufacturing
Work Description
REPAIR STOREFRONT WALL DAMAGED BY VEHICLE AND UPGRADE BATHROOM FEATURES. REPAIRS EXISTING URM PLASTER AND REBUILD PORTION OF EXISTING CMU WALL AT STOREFRONT. COMPLY WITH DEPT'S OREDER.
Permit Issued
Issued on 3/1/2024
Issuing Office
Current Status
Permit Finaled on 10/29/2024

Permit Application Status History

Submitted 11/2/2022 APPLICANT
Assigned to Plan Check Engineer 11/3/2022 SAM CHANG
Corrections Issued 11/15/2022 SAM CHANG
Disabled Access Plans Picked Up 11/15/2022 APPLICANT
Quality Review Completed 11/18/2022 KEN GILL
Building Plans Picked Up 11/22/2022 APPLICANT
Applicant returned to address corrections 11/6/2023 SAM CHANG
Plan Check Approved 3/1/2024 SAM CHANG
Issued 3/1/2024 APPLICANT
Permit Finaled 10/29/2024 DARRYL ARNOLD

Permit Application Clearance Information

DAS Clearance Cleared 7/25/2023 SAM CHANG
Work Adjacent to Public Way Cleared 8/7/2023 LARRY LEE
Historic Resource Verification Cleared 12/6/2023 RAFAEL FONTES
ZI Cleared 12/20/2023 MANERI ROMAN
Redevelopment Project Area Cleared 2/1/2024 YASMINE BASHIRI
Eng Process Fee Ord 176,300 Cleared 2/20/2024 JUSTIN BICOL

Contact Information

Contractor Trinity Contracting Concepts Inc; Lic. No.: 1001565-B 6709 LA TIJERA BLVD #134      LOS ANGELES, CA 90045
Engineer Desai,, Anil T; Lic. No.: C24653 1530 VIA LOS COYOTES      LA HABRA, CA 90631

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 3/8/2024 Not Ready for Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 6/21/2024 Partial Approval ALFREDO LOPEZ
Final 10/4/2024 Not Ready for Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 10/4/2024 SGSOV Not Ready ALFREDO LOPEZ
Smoke Detectors 10/4/2024 Not Ready for Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 10/7/2024 Conditional Approval DARRYL ARNOLD
Special/Order Compliance 10/7/2024 Corrections Issued DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/9/2024 SGSOV Not Ready DARRYL ARNOLD
Final 10/29/2024 Permit Finaled DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/29/2024 SGSOV No Gas DARRYL ARNOLD
Smoke Detectors 10/29/2024 Approved DARRYL ARNOLD