515 S FLOWER ST LVL 1 90071

Certificate Information: 515 S FLOWER ST LVL 1 90071

Application / Permit
22016-10000-33229
Plan Check / Job No.
B22LA22122
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
LEVEL 1- TENANT IMPROVEMENT OF AN EXISTING BUILDING EMPLOYEE LOUNGE TERRACE SPACE TI WORK INCLUDING REPLACING PORTION OF EXISTING STOREFRONT WITH GLASS OPERABLE WALL TO MATCH EXISTING WITH STRUCTURAL, REPLACING EXISTING MEDIA WALL WITH NEW CEILING, FINISHES, FURNITURE, MILLWORK AND STRUCTURAL FOR HIGH CEILING/ HEADER, ETC. ALL INTERIOR WORK, NO CHANGE IN FLOOR AREA, NO CHANGE OF USE, OR PARKING
Permit Issued
Issued on 12/22/2022
Issuing Office
Current Status
Permit Finaled on 4/5/2024

Permit Application Status History

Submitted 11/1/2022 APPLICANT
Assigned to Plan Check Engineer 11/10/2022 AUNG SOE
Plan Check Approved 11/17/2022 AUNG SOE
Building Plans Picked Up 11/18/2022 APPLICANT
Issued 12/22/2022 APPLICANT
Permit Finaled 4/4/2024 LUIS CCAMACHO

Permit Application Clearance Information

Fire Marshal Fire Life Safety Cleared 11/16/2022 MENOA AGHAJANI

Contact Information

Architect Alan, Thomas Young; Lic. No.: C34719 500 S FIGUEROA STREET      LOS ANGELES, CA 90071
Contractor Taslimi Construction Co Inc; Lic. No.: 475159-B 1805 COLORADO AVENUE      SANTA MONICA, CA 90404
Engineer Youssef,, Nabih Fouad; Lic. No.: S2026 550 S HOPE ST STE 1700      LOS ANGELES, CA 90071

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Steel/Welding 4/26/2023 Conditional Approval MICHAEL ROSENBERG
Light Gage Steel Frame 7/17/2023 Corrections Issued KATY RAMIREZ
Light Gage Steel Frame 7/21/2023 Partial Approval VAHE KELEDJIAN
Structural Steel Frame 7/21/2023 Partial Approval VAHE KELEDJIAN
Wall Anchors 7/21/2023 Partial Approval VAHE KELEDJIAN
Drywall Nailing 8/2/2023 Approved KATY RAMIREZ
SGSOV-Seismic Gas S/O Valve 12/5/2023 SGSOV No Gas KATY RAMIREZ
Final 3/21/2024 Not Ready for Inspection LUIS CCAMACHO
Green Building Final 3/21/2024 Not Ready for Inspection LUIS CCAMACHO
Smoke Detectors 3/21/2024 Not Ready for Inspection LUIS CCAMACHO
Final 4/1/2024 Not Ready for Inspection JEROME BLACKWOOD
Green Building Final 4/1/2024 Not Ready for Inspection JEROME BLACKWOOD
Smoke Detectors 4/1/2024 Approved JEROME BLACKWOOD
Final 4/4/2024 Permit Finaled LUIS CCAMACHO
Green Building Final 4/4/2024 Approved LUIS CCAMACHO