1257 N MONACO DR 90049

Certificate Information: 1257 N MONACO DR 90049

Application / Permit
22016-10000-31257
Plan Check / Job No.
B22LA20785
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL AND REPLACEMENT OF EXTERIOR DOORS & WINDOWS OF EXISTING SFR. NO ADDITIONAL SQ FOOTAGE
Permit Issued
Issued on 12/11/2023
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 11/13/2024

Permit Application Status History

Submitted 10/14/2022 APPLICANT
Assigned to Plan Check Engineer 10/20/2022 KHUONG TRUONG
Corrections Issued 10/20/2022 KHUONG TRUONG
Building Plans Picked Up 11/16/2022 APPLICANT
Plan Check Approved 12/14/2022 JOSEPH RAFOLS
Issued 12/11/2023 APPLICANT
Permit Finaled 11/13/2024 ARAM AVEDISIAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 12/8/2022 BRIAN MILLER

Contact Information

Contractor Montanari Construction; Lic. No.: 231180-B 2402 31ST STREET      SANTA MONICA, CA 90405
Engineer Warling,, Jeffrey Paul; Lic. No.: C43743 1792 PEREGRINE CT      SIMI VALLEY, CA 93065

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 3/1/2024 Approved ARAM AVEDISIAN
Footing/Foundation/Slab 3/1/2024 Approved ARAM AVEDISIAN
PLUMBING-Rough 3/4/2024 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 3/19/2024 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 4/2/2024 Conditional Approval EVAN COOPER
ELECTRICAL-Rough 4/2/2024 Conditional Approval EVAN COOPER
Insulation 4/8/2024 Approved ARAM AVEDISIAN
Drywall Nailing 4/16/2024 Approved TEMISTOCLES CAAL
Interior/Exterior Lathing 4/26/2024 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 6/3/2024 Partial Approval ARAM AVEDISIAN
Shower Pan 6/3/2024 Approved ARAM AVEDISIAN
ELECTRICAL-Final 10/22/2024 Corrections Issued JESUS RODRIGUEZ
Final 10/22/2024 Corrections Issued JESUS RODRIGUEZ
HVAC-Final 10/22/2024 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Final 10/22/2024 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 10/22/2024 SGSOV Not Ready JESUS RODRIGUEZ
Smoke Detectors 10/22/2024 Corrections Issued JESUS RODRIGUEZ
Final 11/13/2024 Permit Finaled ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 11/13/2024 SGSOV Approved ARAM AVEDISIAN
Service/Power Release 11/13/2024 Not Required ARAM AVEDISIAN
Smoke Detectors 11/13/2024 Approved ARAM AVEDISIAN