1525 W GRIFFITH PARK BLVD 90026

Certificate Information: 1525 W GRIFFITH PARK BLVD 90026

Application / Permit
22016-10000-30251
Plan Check / Job No.
B22LA20005
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(15) Telecommunication Transmitter - wireless
Work Description
SECTOR SCOPE OF WORK: install (6) proposed panel antennas (2 per sector), install (1) proposed FRP screenbox (paint to match (E) building), install (12) proposed RRUs (4 per sector), install (1) proposed surge suppression device. install (3) proposed hybrid cables (1 per sector), install proposed jumpers from RRU to antennas as req. EQUIPMENT SCOPE OF WORK: install (1) proposed 8'-0" tall chain link fence equipment enclosure with new concrete slab on grade with utility H-frame. install (1) proposed equipment cabinet W/ BBU. Install (1) proposed emergency back up generator. install (1) proposed power conduit, install (1) proposed telco conduit. Install (1) proposed NEMA 3-telco fiber box. Install (1) proposed GPS antenna, install camlock gen LUG intersect at ground level. Install (1) 15KW, 95 gal diesel generator.
Permit Issued
Issued on 3/20/2023
Issuing Office
Current Status
Issued on 3/20/2023

Permit Application Status History

Submitted 11/1/2022 APPLICANT
Assigned to Plan Check Engineer 11/8/2022 JOE VO
Corrections Issued 11/9/2022 JOE VO
Plan Check Approved 3/10/2023 JOE VO
Issued 3/20/2023 APPLICANT

Permit Application Clearance Information

"Q" conditions Cleared 12/22/2022 KATHERINE RICE
Plan Approval Cleared 12/22/2022 KATHERINE RICE
ZA Case Cleared 12/22/2022 KATHERINE RICE

Contact Information

Contractor Solex Contracting Inc; Lic. No.: 842101-B       ,
Engineer Connell,, Daniel Michael; Lic. No.: NA62543       ,
Engineer Diaz,, Kevin Christian; Lic. No.: C87584 13039 BONITA VISTA ST      POWAY, CA 92064

Inspector Information

TIMOTHY POWELL, (213) 482-0360 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 5/19/2023 No Access for Inspection RAFAEL CORTES
Footing/Foundation/Slab 5/23/2023 Approved TIMOTHY POWELL