2562 S WELLESLEY AVE 90064

Certificate Information: 2562 S WELLESLEY AVE 90064

Application / Permit
22016-10000-27711
Plan Check / Job No.
B22LA18469
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
8'-2" X 13'-5" ADDITION FOR INGRESS/EGRESS AND CONVERT (E) 18'-4" x 18'-4" DETACHED GARAGE INTO (N) ACCESSORY DWELLING UNIT PER GCS65852.2(e)(1)(A). WORK PER ENGINEERING.
Permit Issued
Issued on 7/26/2023
Issuing Office
Current Status
CofO Issued on 3/5/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/15/2022 APPLICANT
Assigned to Plan Check Engineer 9/22/2022 ALEC MOUSAKHANIAN
Corrections Issued 9/23/2022 ALEC MOUSAKHANIAN
Applicant returned to address corrections 12/22/2022 DANIEL ABRAMYAN
Applicant returned to address corrections 3/1/2023 ISIS ARGUETA
Plan Check Approved 4/12/2023 DANIEL ABRAMYAN
Issued 7/26/2023 APPLICANT
CofO in Progress 3/4/2025 BOBBY KEY
Permit Finaled 3/5/2025 RICHARD STEINBACH
CofO Issued 3/5/2025 RICHARD STEINBACH
Permit Finaled 3/5/2025 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 11/15/2022 AHMED AMARRAGY
Sewer availability Cleared 11/15/2022 AHMED AMARRAGY
Specific Plan Cleared 11/30/2022 VALERIA CEJA
Eng Process Fee Ord 176,300 Cleared 12/17/2022 AHMED AMARRAGY
Roof/Waste drainage to street Cleared 12/17/2022 AHMED AMARRAGY
Specific Plan Cleared 4/10/2023 RYAN LY

Contact Information

Contractor Grc Energy Inc; Lic. No.: 1072301-B       ,
Contractor Green Retrofits California; Lic. No.: 1072301-B       ,
Engineer Le,, Thang Huu; Lic. No.: NA4978       ,

Inspector Information

KIRK SANDERS, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI
ARAM AVEDISIAN, (310) 914-3896 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Sewer 8/1/2023 Partial Approval RICHARD STEINBACH
Excavation/Setback/Form/Re-Bar 8/17/2023 Corrections Issued JESUS PINEDA
Excavation/Setback/Form/Re-Bar 8/18/2023 No Access for Inspection MEL KHACHATOURIAN
BUILDING-Rough-Frame 8/30/2023 Not Ready for Inspection JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 8/30/2023 Corrections Issued JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Approved JESUS PINEDA
BUILDING-Rough-Frame 10/16/2023 Corrections Issued JESUS PINEDA
PLUMBING-Rough 10/16/2023 Approved JESUS PINEDA
Interior/Exterior Lathing 10/23/2023 Approved BEN MOLSTAD
Shower Pan 10/23/2023 Approved BEN MOLSTAD
Interior/Exterior Lathing 10/27/2023 Approved BEN MOLSTAD
ELECTRICAL-Rough 12/22/2023 Corrections Issued JESUS PINEDA
Floor/Roof Diaphrgm/Shear Wall 12/22/2023 Partial Inspection JESUS PINEDA
HVAC-Rough 12/22/2023 Corrections Issued JESUS PINEDA
ELECTRICAL-Rough 12/28/2023 Not Ready for Inspection JESUS PINEDA
ELECTRICAL-Rough 1/10/2024 Approved JESUS PINEDA
HVAC-Rough 1/10/2024 Approved JESUS PINEDA
PLUMBING-Rough 1/10/2024 Approved JESUS PINEDA
BUILDING-Rough-Frame 1/17/2024 Corrections Issued JESUS PINEDA
Insulation 1/17/2024 Corrections Issued JESUS PINEDA
Underground Mechanical 1/17/2024 Partial Approval JESUS PINEDA
BUILDING-Rough-Frame 1/23/2024 Approved JESUS PINEDA
Insulation 1/23/2024 Approved JESUS PINEDA
Drywall Nailing 2/8/2024 Approved JESUS PINEDA
Service/Power Release 9/30/2024 Corrections Issued DANIEL VERA
Final 2/10/2025 Corrections Issued DANIEL VERA
Service/Power Release 2/10/2025 Not Ready for Inspection DANIEL VERA
ELECTRICAL-Final 3/4/2025 Approved BOBBY KEY
Final 3/4/2025 OK to Issue CofO BOBBY KEY
HVAC-Final 3/4/2025 Approved BOBBY KEY
PLUMBING-Final 3/4/2025 Approved BOBBY KEY
SGSOV-Seismic Gas S/O Valve 3/4/2025 SGSOV Approved BOBBY KEY
Service/Power Release 3/4/2025 Approved BOBBY KEY
Smoke Detectors 3/4/2025 Approved BOBBY KEY