1002 E GARFIELD AVE 90291

Certificate Information: 1002 E GARFIELD AVE 90291

Application / Permit
22016-10000-27573
Plan Check / Job No.
B22LA18377
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN Exterior/Interior remodeling to an existing 1-story residential house including; remodel kitchen, convert (E) bedroom to new bathroom , remodel existing bathroom, replacing windows, new deck at rear of the house , fire sprinkler system is required throughout the building
Permit Issued
Issued on 12/1/2022
Issuing Office
Current Status
Permit Finaled on 6/8/2023

Permit Application Status History

Submitted 9/13/2022 APPLICANT
Assigned to Plan Check Engineer 9/19/2022 MINA HABILI
Corrections Issued 9/20/2022 MINA HABILI
Plan Check Approved 11/14/2022 MINA HABILI
Issued 12/1/2022 APPLICANT
Permit Finaled 6/7/2023 JESUS RODRIGUEZ
CofO in Progress 6/8/2023 JESUS RODRIGUEZ
CofO in Progress 6/8/2023 RICHARD STEINBACH

Permit Application Clearance Information

Specific Plan Cleared 9/22/2022 EILEEN HUNT
Specific Plan Cleared 11/8/2022 IRA BROWN
Coastal Zone Cleared 11/9/2022 MAXFIELD VERMY

Contact Information

Contractor Frame 2 Finish Inc; Lic. No.: 903440-B       ,
Engineer Alferez,, Vicente Narvaez; Lic. No.: C53875 460 E CARSON PLAZA DR STE 212      CARSON, CA 90746

Inspector Information

DAKOTA LOW, (310) 914-3895 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/16/2022 Conditional Approval JESUS RODRIGUEZ
PLUMBING-Rough 12/16/2022 Approved JESUS RODRIGUEZ
BUILDING-Rough-Frame 1/13/2023 Not Ready for Inspection JESUS RODRIGUEZ
ELECTRICAL-Rough 1/13/2023 Partial Approval JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 1/13/2023 Partial Approval JESUS RODRIGUEZ
Footing/Foundation/Slab 1/13/2023 Approved JESUS RODRIGUEZ
HVAC-Rough 1/13/2023 Approved JESUS RODRIGUEZ
Shower Pan 1/13/2023 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 1/26/2023 Partial Approval HERBERT GIRON
ELECTRICAL-Rough 1/30/2023 Approved EVAN COOPER
Insulation 1/30/2023 Approved EVAN COOPER
Verify Sprinkler Sign Off 1/30/2023 Approved EVAN COOPER
Drywall Nailing 2/6/2023 Conditional Approval JESUS RODRIGUEZ
Interior/Exterior Lathing 3/1/2023 Partial Approval JESUS RODRIGUEZ
Insulation 3/22/2023 Approved JESUS RODRIGUEZ
Interior/Exterior Lathing 3/22/2023 Approved JESUS RODRIGUEZ
Service/Power Release 4/17/2023 Approved EVAN COOPER
ELECTRICAL-Final 5/31/2023 Corrections Issued JESUS RODRIGUEZ
Final 5/31/2023 Corrections Issued JESUS RODRIGUEZ
HVAC-Final 5/31/2023 Corrections Issued JESUS RODRIGUEZ
PLUMBING-Final 5/31/2023 Approved JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 5/31/2023 SGSOV Approved JESUS RODRIGUEZ
Smoke Detectors 5/31/2023 Approved JESUS RODRIGUEZ
ELECTRICAL-Final 6/7/2023 Approved JESUS RODRIGUEZ
Final 6/7/2023 Permit Finaled JESUS RODRIGUEZ
HVAC-Final 6/7/2023 Approved JESUS RODRIGUEZ