1706 S VERMONT AVE 90006
Certificate Information: 1706 S VERMONT AVE 90006
- Application / Permit
- 22016-10000-27266
- Plan Check / Job No.
- X22LA14094
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __22____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. 8- Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24 4- Kitchen 4- bathroom remodel for residential buildings (no structural changes). Water damage, termite damage/ dry rot repair less than 10% of replacement cost of residential buildings. "COMPLY WITH DEPARTMENT ORDER effective date 08/26/2022. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
- Permit Issued
- Issued on 9/9/2022
- Issuing Office
- Current Status
- Permit Finaled on 3/16/2023
Permit Application Status History
| Issued | 9/9/2022 | APPLICANT |
| Permit Finaled | 1/19/2023 | MARTIN TAVITIAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Sheene Paul Corporation; Lic. No.: 1015399-B | 940 S WESTERN AVE #B LOS ANGELES, CA 90006 |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Final | 10/26/2022 | Not Ready for Inspection | TIMOTHY BUXTON |
| SGSOV-Seismic Gas S/O Valve | 10/26/2022 | SGSOV Approved | TIMOTHY BUXTON |
| Smoke Detectors | 10/26/2022 | Approved | TIMOTHY BUXTON |
| Final | 12/5/2022 | Partial Inspection | RONALD JIMENEZ |
| Final | 12/19/2022 | Not Ready for Inspection | TIMOTHY POWELL |
| Final | 12/23/2022 | Not Ready for Inspection | RAMAZANALI ALMASI |
| Final | 1/19/2023 | Permit Finaled | MARTIN TAVITIAN |