309 S BUNDY DR 90049
Certificate Information: 309 S BUNDY DR 90049
- Application / Permit
- 22016-10000-26903
- Plan Check / Job No.
- X22LA13910
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1) Bathroom remodel for residential buildings (no structural changes). ELECTRICAL, PLUMBING, AND HVAC INCLUDED. (1) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing __27___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0 (b) 2B.
- Permit Issued
- Issued on 9/6/2022
- Issuing Office
- Current Status
- Permit Finaled on 12/7/2022
Permit Application Status History
| Issued | 9/6/2022 | APPLICANT |
| Permit Finaled | 12/6/2022 | KEVIN SARGSYAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Hillstar Construction Inc; Lic. No.: 972213-B | 22647 VENTURA BLVD #173 WOODLAND HILLS, CA 91364 |
Inspector Information
| HERBERT GIRON, (310) 914-3891 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| PLUMBING-Rough | 9/15/2022 | Partial Approval | KEVIN SARGSYAN |
| Floor/Roof Diaphrgm/Shear Wall | 9/19/2022 | Approved | KEVIN SARGSYAN |
| BUILDING-Rough-Frame | 9/27/2022 | Approved | ANDREW NAVE |
| PLUMBING-Rough | 9/27/2022 | Corrections Issued | ANDREW NAVE |
| PLUMBING-Rough | 10/3/2022 | Corrections Issued | KEVIN SARGSYAN |
| PLUMBING-Rough | 10/5/2022 | Partial Approval | KEVIN SARGSYAN |
| Final | 11/29/2022 | Corrections Issued | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 11/29/2022 | SGSOV Not Ready | KEVIN SARGSYAN |
| Smoke Detectors | 11/29/2022 | Corrections Issued | KEVIN SARGSYAN |
| Final | 12/6/2022 | Permit Finaled | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 12/6/2022 | SGSOV Approved | KEVIN SARGSYAN |
| Smoke Detectors | 12/6/2022 | Approved | KEVIN SARGSYAN |