3432 W WINSLOW DR 90026

Certificate Information: 3432 W WINSLOW DR 90026

Application / Permit
22016-10000-26825
Plan Check / Job No.
B22LA17757
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN Interior renovation of two-story, single family dwelling, and site improvements. Existing building footprint to remain.
Permit Issued
Issued on 6/2/2023
Issuing Office
Current Status
Permit Finaled on 2/26/2025

Permit Application Status History

Submitted 9/6/2022 APPLICANT
Assigned to Plan Check Engineer 9/9/2022 JOSEPH RAFOLS
Corrections Issued 9/10/2022 JOSEPH RAFOLS
Applicant returned to address corrections 9/26/2022 JOSEPH RAFOLS
Plan Check Approved 10/18/2022 JOSEPH RAFOLS
Issued 6/2/2023 APPLICANT
Permit Finaled 2/25/2025 FREDDIE RIVERA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 10/5/2022 KIRK LINKLATER

Contact Information

Architect Chu,, Annie; Lic. No.: C26961 CHU GOODING ARCHITECTS INC.   818 S. BROADWAY STE. 1001    LOS ANGELES, CA 90014
Contractor C R L Construction Inc; Lic. No.: 939761-B       ,
Engineer Perazzelli,, Joseph Ames; Lic. No.: C35270 183 GREENFIELD AVENUE      LOS ANGELES, CA 90049

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/14/2023 Conditional Approval ALIZAH MAYAGOITIA
Excavation/Setback/Form/Re-Bar 9/13/2023 Approved JOSEPH MCGARRY
Pre-Inspection 2/13/2024 Approved FREDDIE RIVERA
Rough-Elec/Plmb/HVAC 2/20/2024 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 2/26/2024 Approved FREDDIE RIVERA
Insulation 4/2/2024 Approved FREDDIE RIVERA
Interior/Exterior Lathing 4/2/2024 Partial Approval FREDDIE RIVERA
Shower Pan 4/2/2024 Approved FREDDIE RIVERA
Drywall Nailing 4/9/2024 Approved FREDDIE RIVERA
Interior/Exterior Lathing 4/9/2024 Partial Approval FREDDIE RIVERA
Final 1/22/2025 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 1/22/2025 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 1/22/2025 Approved FREDDIE RIVERA
Final 2/25/2025 Permit Finaled FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 2/25/2025 SGSOV Approved FREDDIE RIVERA