6544 W BARTON AVE 90038
Certificate Information: 6544 W BARTON AVE 90038
- Application / Permit
- 22016-10000-26711
- Plan Check / Job No.
- B22LA17659
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- Remodel of existing duplex to include removal of interior wall lath and plaster; remove, replace and new windows and doors; remove and reroof composition roofing; replace plumbing system and fixtures; replace electrical system and fixtures; replace gas system and fixtures; reframe and newly framed interior walls; new HVAC system; new 200 amp dual meter electrical panel; new drywall; new floor, ceiling and wall insulation; replace or new concrete stoops; repair ceiling joist deflection with new support beam and posts.
- Permit Issued
- Issued on 9/9/2022
- Issuing Office
- Current Status
- Permit Finaled on 4/13/2023
Permit Application Status History
| Submitted | 9/2/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 9/8/2022 | JOE VO |
| Plan Check Approved | 9/8/2022 | JOE VO |
| Issued | 9/9/2022 | APPLICANT |
| Permit Finaled | 4/12/2023 | BRIAN SULLIVAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| CRAIG VAUGHAN, (213) 202-3250 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 9/14/2022 | Corrections Issued | JOAQUIN GREENOUGH |
| ELECTRICAL-Rough | 9/16/2022 | No Access for Inspection | JOAQUIN GREENOUGH |
| PLUMBING-Rough | 9/16/2022 | No Access for Inspection | JOAQUIN GREENOUGH |
| BUILDING-Rough-Frame | 10/24/2022 | Conditional Approval | JOAQUIN GREENOUGH |
| ELECTRICAL-Rough | 10/24/2022 | Approved | JOAQUIN GREENOUGH |
| HVAC-Rough | 10/24/2022 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| PLUMBING-Rough | 10/24/2022 | Approved | JOAQUIN GREENOUGH |
| BUILDING-Rough-Frame | 11/3/2022 | Approved | JOAQUIN GREENOUGH |
| HVAC-Rough | 11/3/2022 | Approved | JOAQUIN GREENOUGH |
| Insulation | 11/3/2022 | Partial Approval | JOAQUIN GREENOUGH |
| Drywall Nailing | 11/16/2022 | Approved | JOAQUIN GREENOUGH |
| Final | 4/5/2023 | Partial Inspection | JOAQUIN GREENOUGH |
| SGSOV-Seismic Gas S/O Valve | 4/5/2023 | SGSOV Not Ready | JOAQUIN GREENOUGH |
| Smoke Detectors | 4/5/2023 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Service/Power Release | 4/7/2023 | Approved | JOAQUIN GREENOUGH |
| Final | 4/12/2023 | Permit Finaled | BRIAN SULLIVAN |
| SGSOV-Seismic Gas S/O Valve | 4/12/2023 | SGSOV Approved | BRIAN SULLIVAN |
| Smoke Detectors | 4/12/2023 | Approved | BRIAN SULLIVAN |