2739 W HYANS ST 90026

Certificate Information: 2739 W HYANS ST 90026

Application / Permit
22016-10000-26709
Plan Check / Job No.
B22LA17657
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN* INTERIOR REMODEL TO EXISTING TWO-STORY SINGLE FAMILY DWELLING - ALL WORK PER ENGINEER
Permit Issued
Issued on 10/19/2022
Issuing Office
Current Status
Permit Finaled on 8/10/2023

Permit Application Status History

Submitted 9/2/2022 APPLICANT
Assigned to Plan Check Engineer 9/9/2022 DANIEL ABRAMYAN
Corrections Issued 9/10/2022 DANIEL ABRAMYAN
Applicant returned to address corrections 9/19/2022 DANIEL ABRAMYAN
Plan Check Approved 10/3/2022 DANIEL ABRAMYAN
Issued 10/19/2022 APPLICANT
Permit Finaled 8/10/2023 FREDDIE RIVERA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 9/26/2022 CHARLES POWELL

Contact Information

Contractor A M Z Construction Inc; Lic. No.: 1018155-B       ,
Engineer Durand,, Paul H; Lic. No.: S4222 611 N G ST      OXNARD, CA 93030

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/14/2022 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 1/23/2023 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Rough 1/23/2023 Approved FREDDIE RIVERA
HVAC-Rough 1/23/2023 Partial Inspection FREDDIE RIVERA
METHANE-Rough 1/23/2023 Approved FREDDIE RIVERA
PLUMBING-Rough 1/23/2023 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 1/24/2023 Conditional Approval FREDDIE RIVERA
Green Building Rough 1/24/2023 Approved FREDDIE RIVERA
HVAC-Rough 1/24/2023 Approved FREDDIE RIVERA
Insulation 1/27/2023 Approved FREDDIE RIVERA
Drywall Nailing 1/31/2023 Approved FREDDIE RIVERA
Interior/Exterior Lathing 2/3/2023 Approved FREDDIE RIVERA
Interior/Exterior Lathing 2/13/2023 Approved FREDDIE RIVERA
ELECTRICAL-Final 3/20/2023 Corrections Issued JOSE AVILA
BUILDING-Rough-Frame 7/11/2023 Approved FREDDIE RIVERA
Final 7/11/2023 Corrections Issued FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 7/11/2023 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 7/11/2023 No Access for Inspection FREDDIE RIVERA
Final 7/27/2023 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 7/27/2023 SGSOV Not Ready FREDDIE RIVERA
Smoke Detectors 7/27/2023 Partial Inspection FREDDIE RIVERA
Final 8/1/2023 Partial Inspection FREDDIE RIVERA
SGSOV-Seismic Gas S/O Valve 8/1/2023 SGSOV Approved FREDDIE RIVERA
Smoke Detectors 8/1/2023 Approved FREDDIE RIVERA
Final 8/10/2023 Permit Finaled FREDDIE RIVERA