436 N ENTRADA DR 90402

Certificate Information: 436 N ENTRADA DR 90402

Application / Permit
22016-10000-25718
Plan Check / Job No.
B22LA17078
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO RELOCATE WALL BETWEEN BATHROOM AND KITCHEN. REMODEL KITCHEN, TWO BATHROOMS, AND ADD NEW LAUNDRY AREA IN (E) CLOSET.
Permit Issued
Issued on 9/10/2022
Issuing Office
Current Status
Permit Finaled on 3/31/2023

Permit Application Status History

Submitted 8/25/2022 APPLICANT
Assigned to Plan Check Engineer 8/26/2022 JEROME MAGAT PALMA
Corrections Issued 8/27/2022 JEROME MAGAT PALMA
Plan Check Approved 9/8/2022 JEROME MAGAT PALMA
Issued 9/10/2022 APPLICANT
Permit Finaled 3/30/2023 OGANES TARAKHCHYAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 9/1/2022 KIRK LINKLATER

Contact Information

Architect Murphy,, Brian Alfred; Lic. No.: C23187 150 WEST CHANNEL ROAD      SANTA MONICA, CA 90402
Architect Murphy,, Brian Alfred; Lic. No.: NA23187       ,
Contractor Pivotal Development And Design Inc; Lic. No.: 916261-B       ,
Engineer Perazzelli,, Joseph Ames; Lic. No.: C35270 183 GREENFIELD AVENUE      LOS ANGELES, CA 90049
Engineer Perazzelli,, Joseph Ames; Lic. No.: NA35270       ,

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 10/17/2022 Corrections Issued KEVIN SARGSYAN
Sewer 10/17/2022 Not Ready for Inspection KEVIN SARGSYAN
Deputy Drilled-In Anchors 10/18/2022 Conditional Approval KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 10/19/2022 Approved KEVIN SARGSYAN
Footing/Foundation/Slab 10/19/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 10/19/2022 Partial Approval KEVIN SARGSYAN
Footing/Foundation/Slab 10/20/2022 Approved KEVIN SARGSYAN
BUILDING-Rough-Frame 10/28/2022 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Rough 10/28/2022 Approved KEVIN SARGSYAN
HVAC-Rough 10/28/2022 Not Ready for Inspection KEVIN SARGSYAN
PLUMBING-Rough 10/28/2022 Corrections Issued KEVIN SARGSYAN
HVAC-Rough 11/1/2022 Approved KEVIN SARGSYAN
PLUMBING-Rough 11/1/2022 Approved KEVIN SARGSYAN
Wood Frame 11/1/2022 Approved KEVIN SARGSYAN
Drywall Nailing 11/8/2022 Approved KEVIN SARGSYAN
Shower Pan 11/16/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 11/18/2022 Approved KEVIN SARGSYAN
Final 2/15/2023 Corrections Issued OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 2/15/2023 SGSOV Not Ready OGANES TARAKHCHYAN
Smoke Detectors 2/15/2023 Not Ready for Inspection OGANES TARAKHCHYAN
ELECTRICAL-Final 3/30/2023 Approved OGANES TARAKHCHYAN
Final 3/30/2023 Permit Finaled OGANES TARAKHCHYAN
HVAC-Final 3/30/2023 Approved OGANES TARAKHCHYAN
PLUMBING-Final 3/30/2023 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 3/30/2023 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 3/30/2023 Approved OGANES TARAKHCHYAN