212 N COPA DE ORO ROAD 90077

Certificate Information: 212 N COPA DE ORO ROAD 90077

Application / Permit
22016-10000-25131
Plan Check / Job No.
B22LA16716
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Patio Cover
Work Description
ePlan: Remodel to (E) Cabana. Total of two permits. 1 of 2
Permit Issued
Issued on 12/5/2022
Issuing Office
Current Status
Permit Finaled on 9/26/2024

Permit Application Status History

Submitted 8/24/2022 APPLICANT
Assigned to Plan Check Engineer 9/1/2022 TSE MING HUANG
Corrections Issued 10/5/2022 TSE MING HUANG
Quality Review Completed 10/11/2022 EUGENE BARBEAU
Plan Check Approved 12/1/2022 TSE MING HUANG
Issued 12/5/2022 APPLICANT
Permit Finaled 9/25/2024 CHRISTOPHER WILSON

Permit Application Clearance Information

Hydrant and Access approval Cleared 11/5/2022 GILBERT URREA
Grading Pre-Inspection Cleared 11/18/2022 TSE MING HUANG

Contact Information

Contractor Utopia Development Inc; Lic. No.: 710612-B 2371 E 51ST STREET      VERNON, CA 90058
Engineer Hollingsworth,, Robert Alan; Lic. No.: GE2022 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362
Engineer Shniderman,, Jason Bernard; Lic. No.: C20524 16000 SHERMAN WAY #234      VAN NUYS, CA 91607
Engineer Yamini,, Soly; Lic. No.: C33719 540 WARNER AVE      LOS ANGELES, CA 90024
Geologist Hollingsworth,, Robert Alan; Lic. No.: EG1265 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/16/2023 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/24/2023 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/24/2023 Partial Approval CHRISTOPHER WILSON
Deputy Drilled-In Anchors 4/27/2023 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 4/27/2023 Partial Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 4/28/2023 Partial Approval CHRISTOPHER WILSON
Deputy Reinf. Concrete 5/1/2023 Conditional Approval MICHAEL PELHAM
Sewer 5/18/2023 Approved CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 5/23/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 6/6/2023 Corrections Issued CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 6/6/2023 Approved CHRISTOPHER WILSON
ELECTRICAL-Rough 9/1/2023 Corrections Issued CHRISTOPHER WILSON
PLUMBING-Rough 9/1/2023 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 9/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 9/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 9/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
Verify Sprinkler Sign Off 9/6/2023 Not Ready for Inspection CHRISTOPHER WILSON
ELECTRICAL-Rough 10/12/2023 Approved CHRISTOPHER WILSON
PLUMBING-Rough 10/12/2023 Approved CHRISTOPHER WILSON
Pre-Inspection 10/12/2023 Partial Approval CHRISTOPHER WILSON
Verify Sprinkler Sign Off 10/13/2023 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 10/24/2023 Partial Approval CHRISTOPHER WILSON
Shower Pan 10/24/2023 Approved CHRISTOPHER WILSON
BUILDING-Rough-Frame 9/25/2024 Approved CHRISTOPHER WILSON
Final 9/25/2024 Permit Finaled CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 9/25/2024 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 9/25/2024 Approved CHRISTOPHER WILSON