189 S THE GROVE DR 90036

Certificate Information: 189 S THE GROVE DR 90036

Application / Permit
22016-10000-24748
Plan Check / Job No.
B22LA16415
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
ePlan: TI: Interior remodel (cafe/office/break room/stock/elerctric room) within an existing space in an existing bldg. Removing and replacing fixtures. See comment.
Permit Issued
Issued on 3/20/2023
Issuing Office
Current Status
Issued on 3/20/2023

Permit Application Status History

Submitted 8/19/2022 APPLICANT
Assigned to Plan Check Engineer 8/25/2022 TSE MING HUANG
Corrections Issued 10/5/2022 TSE MING HUANG
Quality Review Completed 10/6/2022 EUGENE BARBEAU
Plan Check Approved 2/14/2023 TSE MING HUANG
Issued 3/20/2023 APPLICANT

Permit Application Clearance Information

Fire Marshal Fire Life Safety Cleared 10/6/2022 ANDREW KO
Food establishment approval Cleared 11/8/2022 LACDHS APPROVED
DAS Clearance Cleared 11/17/2022 Hernan Arreola
Food Service Establishment Cleared 1/25/2023 KENNETH BROWNE
Green Code Cleared 2/8/2023 DONALD CRICHLOW

Contact Information

Architect Castelli,, Raffaele; Lic. No.: NA25565       ,
Contractor Sass Electric; Lic. No.: 786782-B       ,
Engineer Habliston,, Alex Douglas; Lic. No.: S6694 13328 NE 20TH ST STE 100      BELLEVUE, WA 98005

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 3/21/2023 Partial Approval JEROME BLACKWOOD
T-Bar Ceiling 3/28/2023 Partial Approval JEROME BLACKWOOD
Wall Anchors 4/10/2023 Partial Approval ALFREDO LOPEZ
Interior/Exterior Lathing 4/17/2023 Partial Approval ALFREDO LOPEZ
Structural Steel Frame 4/19/2023 Partial Approval VAHE KELEDJIAN
Structural Steel Frame 4/21/2023 Partial Inspection ALFREDO LOPEZ
Wall Anchors 4/21/2023 Partial Approval ALFREDO LOPEZ
Light Gage Steel Frame 4/26/2023 Partial Inspection ALFREDO LOPEZ
Wall Anchors 5/1/2023 Partial Approval ALFREDO LOPEZ
Final 5/10/2023 Partial Approval ALFREDO LOPEZ
Green Building Final 5/10/2023 Approved ALFREDO LOPEZ
METHANE-Final 5/10/2023 Approved ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 5/10/2023 SGSOV Approved ALFREDO LOPEZ
Smoke Detectors 5/10/2023 Approved ALFREDO LOPEZ