114 W 110TH ST 90061

Certificate Information: 114 W 110TH ST 90061

Application / Permit
22016-10000-24596
Plan Check / Job No.
X22LA12807
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
(8) Window change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Fire damage repair for residential buildings only (maximum 10% of replacement cost of building). Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing ___2___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B. "Comply with Department Order effective date 11/15/2019."
Permit Issued
Issued on 8/16/2022
Issuing Office
Metro
Current Status
Permit Finaled on 7/26/2023

Permit Application Status History

Issued 8/16/2022 APPLICANT
Permit Finaled 7/26/2023 JAMES CHAVEZ

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Refinish Plus Inc; Lic. No.: 1050293-B 8133 PURITAN ST      DOWNEY, CA 90242

Inspector Information

BEN MOLSTAD, (310) 732-4557 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Final 8/23/2022 No Access for Inspection NEVILLE REID
Smoke Detectors 8/23/2022 No Access for Inspection NEVILLE REID
Final 10/31/2022 Not Ready for Inspection JOHN KLARIN
Pre-Inspection 10/31/2022 Not Ready for Inspection JOHN KLARIN
Smoke Detectors 10/31/2022 Not Ready for Inspection JOHN KLARIN
Final 2/9/2023 Not Ready for Inspection JAMES CHAVEZ
Smoke Detectors 2/9/2023 Not Ready for Inspection JAMES CHAVEZ
Final 5/25/2023 Not Ready for Inspection JAMES CHAVEZ
Smoke Detectors 5/25/2023 Not Ready for Inspection JAMES CHAVEZ
Final 6/22/2023 Corrections Issued JAMES CHAVEZ
Smoke Detectors 6/22/2023 Approved JAMES CHAVEZ
Final 7/26/2023 Permit Finaled JAMES CHAVEZ
Smoke Detectors 7/26/2023 Approved JAMES CHAVEZ