1968 N CUMMINGS DR 90027

Certificate Information: 1968 N CUMMINGS DR 90027

Application / Permit
22016-10000-23386
Plan Check / Job No.
B22LA15465
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL AT (E) SINGLE FAMILY DWELLING AND ALTERATIONS TO INTERIOR PARTITIONS (NON-LOAD BEARING WALLS) . NO EXTERIOR WALL OR WINDOW CHANGES.
Permit Issued
Issued on 9/6/2022
Issuing Office
Metro
Current Status
Permit Finaled on 6/12/2024

Permit Application Status History

Submitted 8/4/2022 APPLICANT
Assigned to Plan Check Engineer 8/4/2022 LUKE GONZALES
Corrections Issued 8/4/2022 LUKE GONZALES
Plan Check Approved 8/23/2022 GEORGE ALVAREZ
Issued 9/6/2022 APPLICANT
Permit Finaled 6/11/2024 ROY SPAULDING

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Refined Projects Construction & Design; Lic. No.: 1033436-B 3626 8TH AVENUE      LOS ANGELES, CA 90018
Engineer Tan,, Charles; Lic. No.: S4758 3161 DRIGGS AVENUE      ROSEMEAD, CA 91770

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 10/19/2022 Partial Approval RYAN SALAZAR
ELECTRICAL-Rough 6/5/2023 Corrections Issued JOAQUIN GREENOUGH
HVAC-Rough 6/5/2023 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 6/5/2023 Corrections Issued JOAQUIN GREENOUGH
ELECTRICAL-Rough 6/30/2023 Not Ready for Inspection JOAQUIN GREENOUGH
HVAC-Rough 6/30/2023 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 6/30/2023 Corrections Issued JOAQUIN GREENOUGH
ELECTRICAL-Rough 7/29/2023 Not Ready for Inspection RAUL BARAJAS
HVAC-Rough 7/29/2023 Not Ready for Inspection RAUL BARAJAS
PLUMBING-Rough 7/29/2023 Not Ready for Inspection RAUL BARAJAS
ELECTRICAL-Rough 8/1/2023 Approved JOAQUIN GREENOUGH
HVAC-Rough 8/1/2023 Corrections Issued JOAQUIN GREENOUGH
PLUMBING-Rough 8/1/2023 Corrections Issued JOAQUIN GREENOUGH
BUILDING-Rough-Frame 8/10/2023 Not Ready for Inspection JOAQUIN GREENOUGH
ELECTRICAL-Rough 8/10/2023 Approved JOAQUIN GREENOUGH
HVAC-Rough 8/10/2023 Not Ready for Inspection JOAQUIN GREENOUGH
PLUMBING-Rough 8/10/2023 Approved JOAQUIN GREENOUGH
Rough-Elec/Plmb/HVAC 8/10/2023 Partial Approval JOAQUIN GREENOUGH
HVAC-Rough 8/17/2023 Approved JOAQUIN GREENOUGH
Wood Frame 8/17/2023 Approved JOAQUIN GREENOUGH
Insulation 8/24/2023 Approved JOAQUIN GREENOUGH
Shower Pan 9/14/2023 Corrections Issued JOAQUIN GREENOUGH
Interior/Exterior Lathing 9/25/2023 Approved JOAQUIN GREENOUGH
Shower Pan 9/25/2023 Approved JOAQUIN GREENOUGH
ELECTRICAL-Final 3/1/2024 Approved SCOTT FINNILA
SGSOV-Seismic Gas S/O Valve 4/16/2024 SGSOV Not Ready ROY SPAULDING
HVAC-Final 4/18/2024 Approved ROY SPAULDING
PLUMBING-Final 4/18/2024 Approved ROY SPAULDING
Final 6/11/2024 Permit Finaled ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 6/11/2024 SGSOV Approved ROY SPAULDING
Smoke Detectors 6/11/2024 Approved ROY SPAULDING