11740 W WILSHIRE BLVD BLDG A 90025

Certificate Information: 11740 W WILSHIRE BLVD BLDG A 90025

Application / Permit
22016-10000-23286
Plan Check / Job No.
B22LA15391
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
RENOVATE (E) 25-STORY APARTMENT BUILDING REPAIR FIRE DAMAGE AND MODERNIZE FIRE LIFE SAFETY SYSTEMS AND MEP SYSTEMS IN COMPLIANCE WITH LAFD REQUIREMENTS. NEW POOL FACILITIES AT PODIUM LEVEL MEP permits under separate permits, Sprinkler sys under separate permit.
Permit Issued
Issued on 6/11/2025
Issuing Office
Metro
Current Status
Issued on 6/11/2025

Permit Application Status History

Submitted 8/10/2022 APPLICANT
Assigned to Plan Check Engineer 9/1/2022 MONICA RAMIREZ
Disabled Access Plans Picked Up 9/12/2022 APPLICANT
Corrections Issued 9/14/2022 MONICA RAMIREZ
Quality Review Completed 9/14/2022 RODOLFO ARIAS
Green Plans Picked Up 9/14/2022 APPLICANT
Applicant returned to address corrections 11/2/2022 MONICA RAMIREZ
Applicant returned to address corrections 11/16/2022 MONICA RAMIREZ
Applicant returned to address corrections 5/5/2023 MONICA RAMIREZ
Applicant returned to address corrections 5/25/2023 MONICA RAMIREZ
Applicant returned to address corrections 10/30/2023 MONICA RAMIREZ
Plan Check Approved 6/4/2025 MONICA RAMIREZ
Issued 6/11/2025 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/28/2022 RAYMOND MUGAMBWA
Sewer availability Cleared 11/8/2022 ANTHONY MAINEZ
"Q" conditions Cleared 11/18/2022 MAXFIELD VERMY
Frnt yard landscape/Water mgmt Cleared 11/18/2022 MAXFIELD VERMY
Miscellaneous Cleared 11/18/2022 MAXFIELD VERMY
Site Plan review Cleared 11/18/2022 MAXFIELD VERMY
Supp. Use District POD/CDO/TDO Cleared 11/18/2022 MAXFIELD VERMY
ZI Cleared 11/18/2022 MAXFIELD VERMY
DAS Clearance Cleared 4/18/2023 SHINE LIN
Green Code Cleared 4/26/2023 MONICA RAMIREZ
Fire Marshal Fire Life Safety Cleared 11/13/2023 MENOA AGHAJANI
Building over 36-ft Cleared 11/14/2023 CALOSHA APPROVED
SB8 RUD Cleared 4/11/2024 LOUIE MILLER
Tenant Habitability Plan Cleared 5/27/2025 RICARDO BOHORQUEZ

Contact Information

Architect Barsuk,, Peter S; Lic. No.: C27971 708 7TH STREET      HERMOSA BEACH, CA 90254
Contractor Matt Construction Corporation; Lic. No.: 631020-B 9814 NORWALK BLVD #100      SANTA FE SPRINGS, CA 90670
Engineer Kenyon,, Lance; Lic. No.: S3399 3900 COVER STREET      LONG BEACH, CA 90808

Inspector Information

CASIMIR BRITTON, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI
SHAVONNE ESPINOZA, (310) 914-3913 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Deputy Steel/Welding 6/8/2026   
Deputy Steel/Welding 6/9/2026   

Inspection Request History

Deputy Fireproofing 10/28/2025 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 11/13/2025 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 12/19/2025 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 12/19/2025 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 12/22/2025 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 12/22/2025 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 12/23/2025 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 12/23/2025 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 12/24/2025 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 12/24/2025 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 12/26/2025 Conditional Approval PAUL DAVIDSON
Deputy Steel/Welding 12/26/2025 Conditional Approval PAUL DAVIDSON
Deputy Drilled-In Anchors 1/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/6/2026 Conditional Approval CASIMIR BRITTON
Pre-Inspection 1/6/2026 Partial Inspection DANIEL VARNUM
Structural Steel Frame 1/6/2026 Partial Inspection DANIEL VARNUM
Deputy Drilled-In Anchors 1/7/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/7/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 1/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/8/2026 Conditional Approval CASIMIR BRITTON
Reinforced Concrete Frame 1/8/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 1/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/27/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 1/27/2026 Partial Approval CASIMIR BRITTON
Deputy Reinf. Concrete 1/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 1/29/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/29/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 1/29/2026 Partial Approval CASIMIR BRITTON
Deputy Reinf. Concrete 1/30/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 1/30/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/3/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 2/3/2026 Partial Approval CASIMIR BRITTON
Reinforced Concrete Frame 2/3/2026 Partial Approval CASIMIR BRITTON
Deputy Steel/Welding 2/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/5/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/11/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 2/11/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 2/11/2026 Partial Inspection CASIMIR BRITTON
Structural Steel Frame 2/11/2026 Partial Approval CASIMIR BRITTON
Deputy Fireproofing 2/12/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/12/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/12/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/13/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 2/13/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 2/13/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/17/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 2/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/17/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 2/17/2026 Approved CASIMIR BRITTON
Structural Steel Frame 2/17/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 2/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/23/2026 Conditional Approval CASIMIR BRITTON
Pre-Inspection 2/23/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 2/24/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/24/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/24/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/24/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 2/24/2026 Not Ready for Inspection CASIMIR BRITTON
Light Gage Steel Frame 2/24/2026 Not Ready for Inspection CASIMIR BRITTON
Wall Anchors 2/24/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 2/25/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/25/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/25/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/25/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 2/25/2026 Partial Approval CASIMIR BRITTON
Reinforced Concrete Frame 2/25/2026 Partial Approval CASIMIR BRITTON
Structural Steel Frame 2/25/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 2/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 2/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 2/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 2/27/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 2/27/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/3/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/3/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/4/2026 Conditional Approval CASIMIR BRITTON
Reinforced Concrete Frame 3/4/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/5/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/5/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/5/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/5/2026 Conditional Approval CASIMIR BRITTON
Light Gage Steel Frame 3/5/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 3/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/6/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/6/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 3/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/10/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/10/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/12/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/12/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/12/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 3/12/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/12/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/16/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/16/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/16/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/16/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 3/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/18/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/18/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/19/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/19/2026 Partial Approval CASIMIR BRITTON
Reinforced Concrete Frame 3/19/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/23/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/23/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 3/24/2026 Conditional Approval FARHAD DADBIN
Deputy Fireproofing 3/24/2026 Conditional Approval FARHAD DADBIN
Deputy Reinf. Concrete 3/24/2026 Conditional Approval FARHAD DADBIN
Deputy Steel/Welding 3/24/2026 Conditional Approval FARHAD DADBIN
Deputy Drilled-In Anchors 3/25/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 3/25/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/25/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/25/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/25/2026 Partial Approval CASIMIR BRITTON
Light Gage Steel Frame 3/25/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/27/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 3/27/2026 Partial Inspection CASIMIR BRITTON
Structural Steel Frame 3/27/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 3/31/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 3/31/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 3/31/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 3/31/2026 Conditional Approval CASIMIR BRITTON
Excavation/Setback/Form/Re-Bar 3/31/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/2/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/2/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/6/2026 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/6/2026 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 4/6/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/6/2026 Corrections Issued DANIEL VARNUM
Deputy Drilled-In Anchors 4/7/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/7/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/7/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/7/2026 Conditional Approval CASIMIR BRITTON
Light Gage Steel Frame 4/7/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/9/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/9/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 4/9/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 4/9/2026 Partial Approval CASIMIR BRITTON
Light Gage Steel Frame 4/9/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/10/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/10/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/10/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/13/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/13/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/13/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/14/2026 Conditional Approval DANIEL VARNUM
Deputy Fireproofing 4/14/2026 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 4/14/2026 Conditional Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/16/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/16/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/16/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 4/16/2026 Conditional Approval CASIMIR BRITTON
Excavation/Setback/Form/Re-Bar 4/16/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/16/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/17/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/17/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 4/17/2026 Approved CASIMIR BRITTON
Interior/Exterior Lathing 4/17/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/20/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 4/20/2026 Approved CASIMIR BRITTON
Reinforced Concrete Frame 4/20/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/22/2026 Conditional Approval DANIEL VARNUM
Deputy Fireproofing 4/22/2026 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/22/2026 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 4/22/2026 Conditional Approval DANIEL VARNUM
Special/Order Compliance 4/22/2026 Partial Inspection DANIEL VARNUM
Deputy Drilled-In Anchors 4/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/23/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 4/24/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/24/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 4/24/2026 Conditional Approval CASIMIR BRITTON
Drywall Nailing 4/24/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/24/2026 Partial Approval CASIMIR BRITTON
Deputy Fireproofing 4/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 4/27/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 4/27/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 4/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 4/28/2026 Approved CASIMIR BRITTON
Deputy Reinf. Concrete 4/28/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 4/28/2026 Approved CASIMIR BRITTON
Deputy Drilled-In Anchors 4/29/2026 Approved DERRICK SPENCER
Deputy Fireproofing 4/29/2026 Approved DERRICK SPENCER
Deputy Reinf. Concrete 4/29/2026 Approved DERRICK SPENCER
Deputy Steel/Welding 4/29/2026 Approved DERRICK SPENCER
Pre-Inspection 4/29/2026 Partial Approval RICARDO ROBLES
Reinforced Concrete Frame 4/29/2026 Partial Approval DANIEL VARNUM
Deputy Drilled-In Anchors 4/30/2026 Conditional Approval DANIEL VARNUM
Deputy Fireproofing 4/30/2026 Conditional Approval DANIEL VARNUM
Deputy Reinf. Concrete 4/30/2026 Conditional Approval DANIEL VARNUM
Deputy Steel/Welding 4/30/2026 Conditional Approval DANIEL VARNUM
Light Gage Steel Frame 4/30/2026 Not Ready for Inspection DANIEL VARNUM
Deputy Drilled-In Anchors 5/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/1/2026 No Access for Inspection CASIMIR BRITTON
Deputy Steel/Welding 5/1/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/1/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 5/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/5/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/5/2026 Partial Approval CASIMIR BRITTON
Deputy Steel/Welding 5/5/2026 Approved CASIMIR BRITTON
Interior/Exterior Lathing 5/5/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/6/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/6/2026 Approved CASIMIR BRITTON
Deputy Reinf. Concrete 5/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/6/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/7/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/7/2026 Approved CASIMIR BRITTON
Deputy Reinf. Concrete 5/7/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/7/2026 Approved CASIMIR BRITTON
Footing/Foundation/Slab 5/7/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/7/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/8/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/8/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/11/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/11/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/11/2026 Not Ready for Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 5/12/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/12/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/12/2026 Approved CASIMIR BRITTON
Deputy Drilled-In Anchors 5/13/2026 Conditional Approval ROGELIO REYNA
Deputy Fireproofing 5/13/2026 Conditional Approval ROGELIO REYNA
Deputy Reinf. Concrete 5/13/2026 Conditional Approval ROGELIO REYNA
Deputy Steel/Welding 5/13/2026 Conditional Approval ROGELIO REYNA
Interior/Exterior Lathing 5/13/2026 Partial Approval ROGELIO REYNA
Deputy Drilled-In Anchors 5/14/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/14/2026 Approved CASIMIR BRITTON
Deputy Reinf. Concrete 5/14/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/14/2026 Approved CASIMIR BRITTON
Excavation/Setback/Form/Re-Bar 5/14/2026 Partial Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/14/2026 Partial Approval CASIMIR BRITTON
Light Gage Steel Frame 5/14/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/15/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/18/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/19/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 5/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/19/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/19/2026 Approved CASIMIR BRITTON
Interior/Exterior Lathing 5/19/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/20/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/20/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/20/2026 Conditional Approval CASIMIR BRITTON
Reinforced Concrete Frame 5/20/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/21/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/21/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/22/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/22/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/22/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 5/22/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/22/2026 Partial Inspection CASIMIR BRITTON
Reinforced Concrete Frame 5/22/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/26/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/27/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/27/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 5/27/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 5/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/28/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/28/2026 Conditional Approval CASIMIR BRITTON
Footing/Foundation/Slab 5/28/2026 Partial Approval CASIMIR BRITTON
Structural Steel Frame 5/28/2026 Partial Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 5/29/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 5/29/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 5/29/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 5/29/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 6/1/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 6/1/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 6/1/2026 Conditional Approval CASIMIR BRITTON
Interior/Exterior Lathing 6/1/2026 Partial Inspection CASIMIR BRITTON
Deputy Drilled-In Anchors 6/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 6/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 6/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 6/2/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 6/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 6/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 6/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 6/3/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 6/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Fireproofing 6/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Reinf. Concrete 6/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Steel/Welding 6/4/2026 Conditional Approval CASIMIR BRITTON
Deputy Drilled-In Anchors 6/5/2026 Approved CASIMIR BRITTON
Deputy Fireproofing 6/5/2026 Approved CASIMIR BRITTON
Deputy Reinf. Concrete 6/5/2026 Approved CASIMIR BRITTON
Deputy Steel/Welding 6/5/2026 Approved CASIMIR BRITTON
Interior/Exterior Lathing 6/5/2026 Partial Inspection CASIMIR BRITTON