740 E 108TH ST 90059
Certificate Information: 740 E 108TH ST 90059
- Application / Permit
- 22016-10000-21096
- Plan Check / Job No.
- X22LA11228
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (1) Kitchen (1) bathroom remodel for residential buildings (no structural changes). (7) Window and (2) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __7__Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B.
- Permit Issued
- Issued on 7/21/2022
- Issuing Office
- Current Status
- Permit Finaled on 2/15/2023
Permit Application Status History
| Issued | 7/21/2022 | APPLICANT |
| Permit Finaled | 2/14/2023 | JOHN KLARIN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Owner-Builder | , |
Inspector Information
| JOHN KLARIN, (310) 732-4558 | Office Hours: 7:00-8:00 AM MON-FRI |
| ARTHUR NEGRETE, (310) 732-4558 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 8/2/2022 | Partial Approval | JOHN KLARIN |
| Wood Frame | 8/2/2022 | Partial Approval | JOHN KLARIN |
| Wood Frame | 9/3/2022 | Corrections Issued | DAVID FEILER |
| Pre-Inspection | 9/9/2022 | Partial Approval | ALIZAH MAYAGOITIA |
| Wood Frame | 9/9/2022 | Corrections Issued | ALIZAH MAYAGOITIA |
| Floor/Roof Diaphrgm/Shear Wall | 10/5/2022 | Corrections Issued | SCOTT FINNILA |
| Insulation | 10/5/2022 | Approved | SCOTT FINNILA |
| Drywall Nailing | 10/18/2022 | Conditional Approval | ALIZAH MAYAGOITIA |
| Final | 2/14/2023 | Permit Finaled | JOHN KLARIN |
| SGSOV-Seismic Gas S/O Valve | 2/14/2023 | SGSOV Approved | JOHN KLARIN |
| Smoke Detectors | 2/14/2023 | Approved | JOHN KLARIN |