4501 W FINLEY AVE 90027

Certificate Information: 4501 W FINLEY AVE 90027

Application / Permit
22016-10000-20981
Plan Check / Job No.
B22LA13860
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(35) Condo-Multi Family
Work Description
Elan: Soft-Story seismic retrofit per LABC Chapter 93: Install 6 Special Steel Cantilever Columns
Permit Issued
Issued on 12/20/2022
Issuing Office
Current Status
CofC Issued on 12/18/2023

Permit Application Status History

Submitted 7/15/2022 APPLICANT
Assigned to Plan Check Engineer 7/28/2022 HANS SANTIAGO
Corrections Issued 8/1/2022 HANS SANTIAGO
Quality Review Completed 8/1/2022 LIPING TENG
Plan Check Approved 11/2/2022 ANDREW SANTIAGO
Issued 12/20/2022 APPLICANT
OK for CofC 9/21/2023 VAHE KELEDJIAN
CofC Issued 12/18/2023 WINSTON DUNNING

Permit Application Clearance Information

Tenant Habitability Plan Cleared 12/19/2022 RICARDO BOHORQUEZ

Contact Information

Contractor Optimum Seismic Inc; Lic. No.: 1012702-B 5508 S SANTA FE AVENUE      VERNON, CA 90058
Engineer Park,, Kenan; Lic. No.: C86314 904 S HARVARD BLVD APT 208      LOS ANGELES, CA 90006

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/30/2023 Not Ready for Inspection JAIME RIOS
Wood Frame 1/30/2023 Not Ready for Inspection JAIME RIOS
Wood Frame 1/31/2023 Not Ready for Inspection JAIME RIOS
Wood Frame 2/1/2023 Conditional Approval JAIME RIOS
Footing/Foundation/Slab 2/16/2023 Corrections Issued VAHE KELEDJIAN
Structural Steel Frame 2/16/2023 Corrections Issued VAHE KELEDJIAN
Wall Anchors 2/16/2023 Not Ready for Inspection VAHE KELEDJIAN
Wood Frame 2/16/2023 Corrections Issued VAHE KELEDJIAN
Footing/Foundation/Slab 2/24/2023 Conditional Approval JAIME RIOS
Structural Steel Frame 2/24/2023 Conditional Approval JAIME RIOS
Wood Frame 2/24/2023 Conditional Approval JAIME RIOS
Deputy Reinf. Concrete 2/28/2023 Conditional Approval JAIME RIOS
Drywall Nailing 3/9/2023 Approved VAHE KELEDJIAN
Interior/Exterior Lathing 3/9/2023 Approved VAHE KELEDJIAN
Final 9/21/2023 OK for CofC VAHE KELEDJIAN
SGSOV-Seismic Gas S/O Valve 9/21/2023 SGSOV Approved VAHE KELEDJIAN
Smoke Detectors 9/21/2023 Approved VAHE KELEDJIAN