1452 W 54TH ST 90062

Certificate Information: 1452 W 54TH ST 90062

Application / Permit
22016-10000-20094
Plan Check / Job No.
B22LA13120
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRE DAMAGED REPAIR TO PORTION OF ROOF. NO CHANGE IN SIZE OR HEIGHT OF ROOF AREA. INCLUDES REPLACEMENT OF EXISTING WINDOWS AND DOOR AT AREA OF REPAIR.
Permit Issued
Issued on 7/25/2022
Issuing Office
Metro
Current Status
Permit Finaled on 12/4/2023

Permit Application Status History

Submitted 7/6/2022 APPLICANT
Assigned to Plan Check Engineer 7/6/2022 LAWRENCE QUIRANTE
Corrections Issued 7/6/2022 LAWRENCE QUIRANTE
Plan Check Approved 7/25/2022 FERNANDO FLORES
Issued 7/25/2022 APPLICANT
Permit Finaled 12/1/2023 CRAIG DAVIS

Permit Application Clearance Information

Community Plan Implem. Overlay Cleared 7/14/2022 RAFAEL FONTES

Contact Information

Contractor Evr Gard Construction; Lic. No.: 621683-B 10736 JEFFERSON BLVD #410      CULVER CITY, CA 90230
Engineer Adefeso,, Wole Dayo; Lic. No.: C63361 1620 CENTINELA AVE 3048      INGLEWOOD, CA 90302

Inspector Information

BARRY HACHE, (213) 202-9851 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/23/2022 Partial Approval HORACE FULTZ
Footing/Foundation/Slab 1/30/2023 Approved STUART CHAPMAN
Wood Frame 4/27/2023 Corrections Issued SABAS ALONSO
Deputy Drilled-In Anchors 5/3/2023 Conditional Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 5/11/2023 Partial Approval SABAS ALONSO
Footing/Foundation/Slab 5/11/2023 Approved SABAS ALONSO
Wood Frame 5/22/2023 Not Ready for Inspection SABAS ALONSO
Wood Frame 5/31/2023 Approved STUART CHAPMAN
Interior/Exterior Lathing 7/10/2023 Partial Approval SABAS ALONSO
Final 11/22/2023 Corrections Issued RONNIE MINDANAO
SGSOV-Seismic Gas S/O Valve 11/22/2023 SGSOV Approved RONNIE MINDANAO
Smoke Detectors 11/22/2023 Approved RONNIE MINDANAO
Final 12/1/2023 Permit Finaled CRAIG DAVIS